Sponsored

Change order or leave it alone? What say you?

Change order or leave it alone?

  • Add Co-Pilot 360.

  • Are you nuts!? Leave the order alone!

  • CP360 is NOT a constrained item

  • CP360 is a constrained item


Results are only viewable after voting.

daddio211

2.5L Hybrid
Well-known member
First Name
Eric
Joined
Jul 30, 2021
Threads
29
Messages
876
Reaction score
1,858
Location
St. George, Utah
Vehicle(s)
Hot rods
Engine
2.5L Hybrid
Clubs
 
I ordered a Hybrid XL on 9/15/22. (Hell, who didn't?) I stripped it down to ONLY the 400 W inverter because I can make the other changes I want myself. Actually I can add an inverter myself too.

I didn't add CP360 but have since changed my mind. In your opinion would adding CP360 jeopardize and/or potentially delay my order? I know what I'm going to do, just thought this would be an interesting opinion discussion.

Assuming it my order will actually be built...
Sponsored

 

IdahoDirtFarmer

2.0L EcoBoost
Well-known member
First Name
Shane
Joined
Sep 27, 2022
Threads
1
Messages
437
Reaction score
650
Location
Caldwell, ID
Vehicle(s)
Ram 1500 ordered '23 XLT, Eco, AWD, FX4
Engine
2.0L EcoBoost
Id add it if you want it. You're ordering a new vehicle. You'll always have that thought of "I should have added.....". Now's the time to do it if you want it.
 

gte105u

2.0L EcoBoost
Well-known member
First Name
Craig
Joined
Jul 1, 2022
Threads
30
Messages
1,396
Reaction score
1,757
Location
Katy, TX
Vehicle(s)
'23 Maverick Lariat, '17 Rogue SL, '14 Altima SV
Engine
2.0L EcoBoost
Long term no one really knows what it's going to take. And adding those items may get you into an earlier build group as they look for groupings. So just order what you want, it'll be fine
 

MostlySafeBear

2.5L Hybrid
Well-known member
Joined
May 29, 2022
Threads
18
Messages
523
Reaction score
689
Location
San Francisco, CA
Vehicle(s)
(Eventually) a Ford Truck
Engine
2.5L Hybrid
Personally, I would add the CP360, because it's always better to have extra safety systems rather than not.

As a secondary reason, adding CP360 on the XL also adds power mirrors.

As a third reason, some insurers may give discounts for extra safety features in the CP360 package.

All of these reasons may also increase resale value in the future.
 

leezep

2.0L EcoBoost
Member
First Name
SOTXMAV
Joined
Sep 20, 2022
Threads
0
Messages
17
Reaction score
9
Location
TX
Vehicle(s)
'22 Chevrolet Tahoe LT, '23 Ford Maverick XLT FX4
Engine
2.0L EcoBoost
This Nov will be 1 yr ownership for my 22 maverick xl awd and i have enjoyed everyday of ownership. i ordered a 23 xlt fx4 4ktow and cp360 and ford bedliner. ill wait it out since i have a maverick but decided to upgrade it. i would add the cp360 if you're able to, you are contemplating it... you will regret it later on.
Sponsored

 
 







Top