Sponsored

Been expecting this lol

mikegs1952

2.0L EcoBoost
Well-known member
First Name
mike
Joined
Sep 17, 2022
Threads
5
Messages
53
Reaction score
61
Location
idaho
Vehicle(s)
F150
Engine
2.0L EcoBoost
Got an e-mail stating my truck is scheduled for production week of 4/10, then 4/13, then 4/14 (same week). I can only assume next time I check it will be week of 4/17 ( a week later). I am sure this is just the beginning of several push backs. Seems like Ford would have a better idea. Don't list a start date until you KNOW. I know many of you have been waiting waaaaay longer than me so I guess I should consider myself Lucky??
Sponsored

 

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
46
Messages
2,002
Reaction score
2,132
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
My production date for my 22 went from September to October to November to December to canceled so be glad it's only a few days.
 

numike

2.5L Hybrid
Well-known member
First Name
mike
Joined
Dec 17, 2021
Threads
69
Messages
372
Reaction score
218
Location
96912
Vehicle(s)
car
Engine
2.5L Hybrid
I received similar It WAS march 20th now this:
We have made an adjustment to the production date for your 2023 Maverick LARIAT.

Your vehicle is now scheduled to be built the week of April 17, 2023. We will continue to keep you informed regarding your vehicle's production status.
 

IdahoDirtFarmer

2.0L EcoBoost
Well-known member
First Name
Shane
Joined
Sep 27, 2022
Threads
1
Messages
437
Reaction score
650
Location
Caldwell, ID
Vehicle(s)
Ram 1500 ordered '23 XLT, Eco, AWD, FX4
Engine
2.0L EcoBoost
I've been expecting it to change on mine. Scheduled for week of 4/17 but I'm not holding my breath. Doesn't really bother me if it moves honestly except my Bronco Sport Heritage is scheduled the same week. Would have been cool to pick them up at the same time.
 

Leand60

2.5L Hybrid
Well-known member
First Name
Mark
Joined
Jun 28, 2021
Threads
15
Messages
3,118
Reaction score
8,415
Location
Clearwater FL
Vehicle(s)
2023 Maverick XL Hybrid
Engine
2.5L Hybrid
Got an e-mail stating my truck is scheduled for production week of 4/10, then 4/13, then 4/14 (same week). I can only assume next time I check it will be week of 4/17 ( a week later). I am sure this is just the beginning of several push backs. Seems like Ford would have a better idea. Don't list a start date until you KNOW. I know many of you have been waiting waaaaay longer than me so I guess I should consider myself Lucky??
Welcome to the "experience"
 

Sponsored

dcs12345

2.0L EcoBoost
Well-known member
Joined
Sep 17, 2022
Threads
9
Messages
481
Reaction score
488
Location
TX
Vehicle(s)
07 Chevy
Engine
2.0L EcoBoost
Mine moved from March 27th (Monday) to the Wednesday, then it has now moved to Friday the 31st.
 

2seater

2.5L Hybrid
Well-known member
First Name
Hal
Joined
Dec 13, 2022
Threads
6
Messages
106
Reaction score
112
Location
Appleton, WI
Vehicle(s)
Buick Reatta, Ford Ranger, Subaru Forester
Engine
2.5L Hybrid
Yep, this lifeboat has lots of passengers. Mine was finally scheduled for w/o March 27, five days later went to week of April 17th. At least I have a vin# so it's no longer a unicorn:rolleyes:
 

numike

2.5L Hybrid
Well-known member
First Name
mike
Joined
Dec 17, 2021
Threads
69
Messages
372
Reaction score
218
Location
96912
Vehicle(s)
car
Engine
2.5L Hybrid
yes I have a vin number too
 

numike

2.5L Hybrid
Well-known member
First Name
mike
Joined
Dec 17, 2021
Threads
69
Messages
372
Reaction score
218
Location
96912
Vehicle(s)
car
Engine
2.5L Hybrid
That's a plus Better then most that don' have a production date or a vin

If you dont have a vin/production date than why even chat about your Maverick because technically you dont have one ordered
 
Sponsored

billbillw

2.0L EcoBoost
Well-known member
First Name
Bill
Joined
Sep 15, 2022
Threads
2
Messages
744
Reaction score
786
Location
Metro Atlanta
Vehicle(s)
'23 Maverick Lariat FX4
Engine
2.0L EcoBoost
Knock on wood, but so far, my date hasn't changed. It has been consistent at April 11th since my first email (on Feb 9th).
 

JimParker256

2.5L Hybrid
Well-known member
First Name
Jim
Joined
Aug 9, 2022
Threads
6
Messages
1,568
Reaction score
2,117
Location
Cedar Park, TX
Vehicle(s)
'22 Area 51 Hybrid FE, 2014 Impala
Engine
2.5L Hybrid
Clubs
 
That's a plus Better then most that don' have a production date or a vin

If you dont have a vin/production date than why even chat about your Maverick because technically you dont have one ordered
Ordered? Yes.

Actually scheduled for production? Probably not.

But why be so negative? At some point, all Maverick orders were "Unscheduled - Clean"...
 

JimParker256

2.5L Hybrid
Well-known member
First Name
Jim
Joined
Aug 9, 2022
Threads
6
Messages
1,568
Reaction score
2,117
Location
Cedar Park, TX
Vehicle(s)
'22 Area 51 Hybrid FE, 2014 Impala
Engine
2.5L Hybrid
Clubs
 
Oh, how I'd love to be able to complain that my scheduled build date was being moved around... LOL
 

JBryant

2.5L Hybrid
Well-known member
First Name
Jesse
Joined
Nov 7, 2022
Threads
33
Messages
1,629
Reaction score
2,709
Location
Bowie, TX
Vehicle(s)
2023 Maverick Lariat Hybrid Alto Blue
Engine
2.5L Hybrid
Got an e-mail stating my truck is scheduled for production week of 4/10, then 4/13, then 4/14 (same week). I can only assume next time I check it will be week of 4/17 ( a week later). I am sure this is just the beginning of several push backs. Seems like Ford would have a better idea. Don't list a start date until you KNOW. I know many of you have been waiting waaaaay longer than me so I guess I should consider myself Lucky??
Crazy Ford world. Got mine on 1/26 with build date of week of 2/27. Last week it moved to 3/3. Two days ago it moved back to 2/27, but this time got a window sticker, so hoping for sometime next week, but that could become next month LOL.
Sponsored

 
 







Top