Ordered on October 29, 2021 and still waiting. Ford's latest lie says a January 9 production week so if they keep their word this time it will be 15 months from order to delivery.
 

Newtotrucksvt

2.5L Hybrid
Well-known member
First Name
Luke
Joined
Oct 13, 2021
Threads
5
Messages
83
Reaction score
97
Location
Vermont
Vehicle(s)
Toyota
Engine
2.5L Hybrid
370+ days
 

Grmpy

2.5L Hybrid
Member
First Name
Bill
Joined
Sep 1, 2022
Threads
0
Messages
14
Reaction score
18
Location
Atlanta
Vehicle(s)
Buick
Engine
2.5L Hybrid
390 days and counting
Shipped 10/3/22
Arrived in AZ on 10/5 and is still there as of 10/28/22 according to Ford customer service
 

Sponsored

Frank Alan

2.5L Hybrid
Well-known member
First Name
Alan
Joined
Jul 17, 2021
Threads
0
Messages
54
Reaction score
73
Location
Central Indiana
Vehicle(s)
Kia Telluride
Engine
2.5L Hybrid
494 days total. Hybrid XLT with Lux and 360. So far worth the wait. Love the Hot Pepper Red shine in the Indiana sunshine
 

pndwind

Well-known member
Joined
Oct 17, 2021
Threads
7
Messages
443
Reaction score
703
Location
Heart of Dixie
Vehicle(s)
F450 Amb
Engine
Undecided
Ordered on October 29, 2021 and still waiting. Ford's latest lie says a January 9 production week so if they keep their word this time it will be 15 months from order to delivery.
I’m part of that group also. I ordered mid October. I figure if they build mine in January I won’t see it until early March, putting me at 17 months.
 

xlt-doug

2.0L EcoBoost
Well-known member
First Name
Ed
Joined
Oct 17, 2021
Threads
3
Messages
273
Reaction score
417
Location
New York
Vehicle(s)
Maverick (soon) Escape (current)
Engine
2.0L EcoBoost
Should be 13 months when It arrives. Mind you this is a ecoboost. But have seen hundreds that got them in under 6 months with my same build so who really knows
 

HawkeyeBunny

2.0L EcoBoost
Well-known member
First Name
Colleen
Joined
Jan 12, 2022
Threads
3
Messages
100
Reaction score
112
Location
Rochester, NY
Vehicle(s)
2016 Ford C-Max SE
Engine
2.0L EcoBoost
Ordered 12-27-21, should be delivered some time between 11-8-22 & 11-14-22. So about 10 1/2 months.
 

LMG

New member
First Name
Louis
Joined
Apr 1, 2022
Threads
0
Messages
4
Reaction score
6
Location
Northern Virginia
Vehicle(s)
2019 Jaguar F-Pace, 2018 Jaguar E-Pace
Just wondering what everyone's average wait time for their maverick from order to delivery?
14 Months - Ordered 8/17/21, Delivered 10/4/22
 
Sponsored

TheSEARCH

2.5L Hybrid
Well-known member
First Name
Dan
Joined
Mar 22, 2022
Threads
26
Messages
1,470
Reaction score
1,307
Location
14150
Vehicle(s)
ford
Engine
2.5L Hybrid
So there making 2022 in January of 2023. I was wondering if they could do that I guess I have my answer. Or are those been converted over too 2033 models?
 

ShadowBlack XL440

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Jan 21, 2022
Threads
12
Messages
1,025
Reaction score
1,305
Location
Northern Ohio
Vehicle(s)
Non-Ford, not enought room to list..........
Engine
2.5L Hybrid
Just wondering what everyone's average wait time for their maverick from order to delivery?
My experience should help lower the average delivery. I placed my 2022 order 1/5/2022, my XL EB no option truck was built 3/9, and picked up 4/4. All in all I was impressed considering the others that are still waiting. Now waiting to see how my 2023 XLT hybrid order goes.
 

KGiles

2.5L Hybrid
Active member
First Name
Kevin
Joined
Aug 16, 2022
Threads
3
Messages
28
Reaction score
55
Location
Adel, Ga
Vehicle(s)
1992 Ford F150 Crew Cab XLT
Engine
2.5L Hybrid
Ordered 10/29/21. Just got it 10/08/22. Now I'll say it was worth the wait.