2024 Maverick Scheduling This Week (3/14/24) for Production Weeks 4/8 - 5/27 (See Notes)

Newface

2.0L EcoBoost
Well-known member
Joined
Mar 6, 2023
Threads
137
Messages
144
Reaction score
707
Location
USANDA
Vehicle(s)
Lotsadem
Engine
2.0L EcoBoost
Notes:
• Retail orders only commit for production weeks: 4/29 to 5/27
• Retail and stock orders commit for production weeks: 4/8 to 4/22.
• Please note that XL availability is 21%.

• Best Availability:
• XLT or Lariat Orders w/ 2.0L EcoBoost Gas Engine (999) and Tremor Off-Road Package (17V).

• Limited Availability:
- 993 - 2.5L Hybrid Engine
- W8A/W8B - XL Version SuperCrew® FWD / AWD
- 59D - Black Appearance Package (Opt on XLT and Lariat)
- 96G - Spray-in Bedliner ( Not Available w/ XLT Luxury Package (54L))
- 96J - Bedliner – Modular Hard Drop-in
- 21K - Tonneau Pickup Box Cover – Hard Trifold
- T7R - 225/65R17 A/S BSW Tires (Available only on XL or XLT)

Ford Maverick 2024 Maverick Scheduling This Week (3/14/24) for Production Weeks 4/8 - 5/27 (See Notes) Ford Scheduling Notes - 3.11.24-1


Ford Maverick 2024 Maverick Scheduling This Week (3/14/24) for Production Weeks 4/8 - 5/27 (See Notes) Ford Scheduling Notes - 3.11.24-2


Ford Maverick 2024 Maverick Scheduling This Week (3/14/24) for Production Weeks 4/8 - 5/27 (See Notes) Ford Scheduling Notes - 3.11.24-3
Sponsored

 

Jone

2.5L Hybrid
Well-known member
First Name
Jonathan
Joined
Jul 18, 2023
Threads
5
Messages
62
Reaction score
124
Location
Mi
Vehicle(s)
2024 Mav
Engine
2.5L Hybrid
Hmmm.
Is this the month when the game starts to change? Ford has to build more stock orders because they can only build 21% of XL
orders in USOB?
 

merlin101

2.5L Hybrid
Well-known member
First Name
Anthony
Joined
Jul 17, 2023
Threads
3
Messages
58
Reaction score
84
Location
California
Vehicle(s)
Kia Sorento
Engine
2.5L Hybrid
Hmmm.
Is this the month when the game starts to change? Ford has to build more stock orders because they can only build 21% of XL
orders in USOB?
This is what I’m thinking. With the numbers remaining in queue and the approximate production capability meeting that number (or exceeding it in some months like January), I struggle to imagine ways in which they don’t clear most of the remaining backlog except the hybrid XLs, some ecoboost XLs maybe, and a small number of other hybrids.

Here’s hoping.
 

Pensfan66

2.5L Hybrid
Active member
First Name
Tim
Joined
Mar 4, 2024
Threads
2
Messages
28
Reaction score
19
Location
South Carolina
Vehicle(s)
Maverick
Engine
2.5L Hybrid
So me and my wife ordered our Maverick XL July 19 2023...does that mean possibility of it being built 4/8-5/27??
 

Sponsored

Pensfan66

2.5L Hybrid
Active member
First Name
Tim
Joined
Mar 4, 2024
Threads
2
Messages
28
Reaction score
19
Location
South Carolina
Vehicle(s)
Maverick
Engine
2.5L Hybrid
I see others who ordered their maverick around same time I did and are getting build dates..me ....I get email due to shipping issues we cannot build your maverick.
 

merlin101

2.5L Hybrid
Well-known member
First Name
Anthony
Joined
Jul 17, 2023
Threads
3
Messages
58
Reaction score
84
Location
California
Vehicle(s)
Kia Sorento
Engine
2.5L Hybrid
I see others who ordered their maverick around same time I did and are getting build dates..me ....I get email due to shipping issues we cannot build your maverick.
I’ve been in the same/similar boat—ordered through my dealership the morning pre orders for MY24 opened up in July, picked XLT hybrid lux with no wild/limfac options to try and keep it as fast as possible. Did tons of research and calculated we’d more or less be where we are now in terms of total remaining orders and rate of production—so i figured I’d have had a date by now.

what i failed to account for was my dealership apparently had a significant (probably excessive) number of MY23 orders in their queue, and not that many allocations. I had no clue allocations could put me at the back of the line even if i ordered sooner than others nationally.

So I’ve been seeing folks get near identical builds already delivered and they ordered at the same time or even months later.

it’s really frustrating because there’s no good reason for their system to work this way. They had excuses the last couple years and it seemed like they learned their lessons—except Ford still doesn’t understand how to treat their order holding customers equitably. I shouldn’t lose my place in line because my dealership wasn’t forthright with how overburdened with rollover orders they were.

Basically we’re at the whim of our dealership and how honest and willing to offer up information they are. And that’s a poor basis for a pre-order system.

Your specific problems with your order might be different/your mileage may vary, but that’s what I’ve noticed in my case and just wanted to vent. Hopefully we all get some good news this month!
 

Superg0

2.0L EcoBoost
Well-known member
Joined
Feb 1, 2024
Threads
9
Messages
1,060
Reaction score
1,498
Location
12020
Vehicle(s)
2024 XLT FX4 Azure Gray
Engine
2.0L EcoBoost
whenever I see the Scheduling post come up I try to make some sense of what's going on, but in reality it just confuses me more....still check it every time
 

nmac86

Member
First Name
Nathan
Joined
Jul 8, 2022
Threads
2
Messages
11
Reaction score
27
Location
Minneapolis
Vehicle(s)
bolt
Engine
Undecided
I just received my scheduling email at 9:18AM central time after originally ordering 9-15-22 (546 days.) Build week of May 6th, 2024. VIN ending 888XX. XL Hybrid copilot 360 Hot Pepper Red. I ordered through a medium volume dealer in the midwest.
 

claw887

2.5L Hybrid
New member
Joined
Sep 14, 2023
Threads
0
Messages
4
Reaction score
2
Location
Columbia SC
Vehicle(s)
2020 Honda Accord Hybrid Touring
Engine
2.5L Hybrid
email came in at 10:33est, I ordered july 17, 2023. Build week of may 6, VIN is 918XX. Hybrid lariat BAP. Columbia SC
 
Sponsored

Pensfan66

2.5L Hybrid
Active member
First Name
Tim
Joined
Mar 4, 2024
Threads
2
Messages
28
Reaction score
19
Location
South Carolina
Vehicle(s)
Maverick
Engine
2.5L Hybrid
email came in at 10:33est, I ordered july 17, 2023. Build week of may 6, VIN is 918XX. Hybrid lariat BAP. Columbia SC
Hey I live in Charleston area. I just got email notification my build date week May 13. Any idea how long it takes to build and how long after that to have transported to dealership??
 

rob_s

2.5L Hybrid
Active member
First Name
Rob
Joined
Jul 17, 2023
Threads
4
Messages
26
Reaction score
97
Location
Illinois
Vehicle(s)
2016 Mustang GT, 2024 XLT Hybrid
Engine
2.5L Hybrid
Really getting frustrated at this point. Hybrid XLT Lux ordered on 7/17/23 and still no build date. My dealer told me they had 11 rollovers out of 20 allocations (and received more allocations since then) and I was first in line after that, so I should have a date by now if there's any hope of building them all. I'm about to call Granger because Ford clearly has no intention of giving my dealer any trucks