MY22 Production Extended AGAIN!

Dphares

2.0L EcoBoost
Member
First Name
Don
Joined
Jan 28, 2022
Threads
2
Messages
11
Reaction score
6
Location
Nebraska
Vehicle(s)
Ford Maverick Lariat
Engine
2.0L EcoBoost
I'm sorry man. I'm an Ecoboost order. Originally scheduled for the week of 11/7 but have since moved up to 10/24.

So far I haven't seen any Ecoboost
people pushed to week of 11/14 so wonder if it's just hybrids.

Let's see what others say. Good luck!
My2022 EB was pushed to a production date November 14
Sponsored

 

baldboy

2.5L Hybrid
Banned
Banned
First Name
Stephen
Joined
Dec 6, 2021
Threads
19
Messages
390
Reaction score
394
Location
moody Alabama
Vehicle(s)
Honda CRV.
Engine
2.5L Hybrid
Someone just shared this on FB. Looks like Ford is extending MY22 production at least an additional week beyond what was previously announced.

E3B4250E-DCCA-43C0-AEED-A56FC10AFC04.jpeg


It would appear MY23 production now won't start until at least the week of 11/21.
yes you are so right.Ford is still trying to fill some holes with my 22 orders witch is great
 

Old Ranchero

2.0L EcoBoost
Well-known member
Joined
Apr 1, 2021
Threads
26
Messages
2,587
Reaction score
3,511
Location
CO
Vehicle(s)
2018 F-150 2013 Jeep Grand Cherokee 2022 Maverick
Engine
2.0L EcoBoost
I had a 10/24 build week and found out last Friday that I'm going into production. I have my window sticker. Caught me totally by surprise. Eco, xlt, 360
I had Oct 3 build week, then got a text from my dealer yesterday I had a window sticker. Checked Ford tracking site and it says In Production and printed out my sticker. Not gonna get too excited or let down either way after all this time, but maybe I'll have my Mav for Christmas 🎅
 

Maverickblues

2.0L EcoBoost
Well-known member
Joined
Feb 24, 2022
Threads
3
Messages
313
Reaction score
261
Location
CA
Vehicle(s)
2003 F-150
Engine
2.0L EcoBoost
I had Oct 3 build week, then got a text from my dealer yesterday I had a window sticker. Checked Ford tracking site and it says In Production and printed out my sticker. Not gonna get too excited or let down either way after all this time, but maybe I'll have my Mav for Christmas 🎅
I feel the same, even hoping before Thanksgiving!
 

Timothyd

2.5L Hybrid
Well-known member
First Name
Tim
Joined
Nov 10, 2021
Threads
52
Messages
4,122
Reaction score
3,512
Location
Illinois
Vehicle(s)
Buick Encore, Miata, motorcycles
Engine
2.5L Hybrid
Clubs
 
Someone just shared this on FB. Looks like Ford is extending MY22 production at least an additional week beyond what was previously announced.

E3B4250E-DCCA-43C0-AEED-A56FC10AFC04.jpeg


It would appear MY23 production now won't start until at least the week of 11/21.
I got the same email yesterday and I would be surprised if it didn't happen. I'll be surprised if they don't extend the '22 assembly into December.
 

Sponsored

juggler

2.0L EcoBoost
Member
Joined
Sep 21, 2022
Threads
0
Messages
15
Reaction score
13
Location
North Carolina
Vehicle(s)
2022 Ford Maverick XL Ecoboost
Engine
2.0L EcoBoost
My 2022 EB XL was moved from 10/31 to 11/7. Got the email yesterday.
 

JoeTime

2.5L Hybrid
Well-known member
First Name
Joe
Joined
Apr 27, 2022
Threads
16
Messages
253
Reaction score
252
Location
47025
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
The fact is MY23 production was supposed to commence 11/14 so whether it's a day, a week or a month Ford is slipping further behind schedule.

Hey, my truck is one of the remaining 22s to be built so I hope they get things together as much or more than anyone...
My 22 is now rescheduled for the week of Nov. 8th. I am assuming I/we won't be getting vehicles with with all the recalls of earlier builds.
 

David F

2.5L Hybrid
Well-known member
Joined
Aug 18, 2022
Threads
7
Messages
71
Reaction score
118
Location
NOVA
Vehicle(s)
F150
Engine
2.5L Hybrid
Someone just shared this on FB. Looks like Ford is extending MY22 production at least an additional week beyond what was previously announced.

E3B4250E-DCCA-43C0-AEED-A56FC10AFC04.jpeg


It would appear MY23 production now won't start until at least the week of 11/21.
You really can't believe those e-mails. I've gotten four and the dates have changed from 9/5 to 9/26 to 11/14 to 10/17.
Until a window sticker is generated or you see the modules go live these email are just propaganda.
 

NJ Pinelands

2.5L Hybrid
Well-known member
Joined
Oct 31, 2021
Threads
187
Messages
2,212
Reaction score
2,674
Location
New Jersey
Vehicle(s)
Chevrolet
Engine
2.5L Hybrid
Someone just shared this on FB. Looks like Ford is extending MY22 production at least an additional week beyond what was previously announced.

E3B4250E-DCCA-43C0-AEED-A56FC10AFC04.jpeg


It would appear MY23 production now won't start until at least the week of 11/21.
Great news !!! Build them to December 31 at 11:59 !
 

Impetus19

2.5L Hybrid
Well-known member
Joined
Sep 6, 2022
Threads
0
Messages
622
Reaction score
669
Location
NJ
Vehicle(s)
2010 Mazda 3, 1979 CJ5 360 3spd, 2015 prius
Engine
2.5L Hybrid
You really can't believe those e-mails. I've gotten four and the dates have changed from 9/5 to 9/26 to 11/14 to 10/17.
Until a window sticker is generated or you see the modules go live these email are just propaganda.
It must be chaos on the production floor with how often they change those dates.
 
Sponsored

Retired

2.5L Hybrid
Well-known member
Joined
Sep 20, 2022
Threads
10
Messages
146
Reaction score
174
Location
Southern Tier NY
Vehicle(s)
2023 Maverick Hybrid, 2012 focus
Engine
2.5L Hybrid
My XLT Hybrid week of 10/17 just got moved to week of 10/24. Waiting for next e-mail telling me it's getting pushed out some more. Only waiting a year now.🤷‍♂️
 

BradGroux

2.5L Hybrid
Well-known member
Joined
Sep 12, 2022
Threads
0
Messages
198
Reaction score
332
Location
Houston
Website
msft.expert
Vehicle(s)
2023 F-150 XLT Powerboost
Engine
2.5L Hybrid
So, is the originally planned MY23 first scheduling date, set for tomorrow (thursday the 29th) still happening or ......?
That’s the word. Luckily, they can still schedule even if they aren’t ready to build... I guess.
 

Deleted member 5597

Guest
Nope. Not this week.
It is supposed to be scheduled for tomorrow for 14 Nov build week, but IDK if that changed. I haven’t seen any official word from admin nor @Tim Bartz.

I was send a production date letter on 22 Aug for a 19 Sept build date, then pushed back to 26 Sept, 3 Oct, and now 10 Oct. Ordered a hybrid XLT with lux and CP, but was notified by the dealer on 23 Aug that he removed CP and the Lux on his own to get it into production. I’m not taking delivery on it. I picked up a hybrid VB with the Lux pkg, SIBL, and a hard top, tri-fold tonneau cover that a customer canceled back on 30 March.
I ordered a hybrid Lariat, Lux, CP360, CP360 Assist, and BAP from a different dealer on 15 Sept.
 
OP
OP
pa-outdoorsman

pa-outdoorsman

2.0L EcoBoost
Well-known member
Joined
Jan 26, 2022
Threads
120
Messages
2,190
Reaction score
4,651
Location
PA
Vehicle(s)
2022 Maverick XLT, EB, LUX, FX4, 4K, Cactus Gray
Engine
2.0L EcoBoost
Clubs
 
It must be chaos on the production floor with how often they change those dates.
Actually, I doubt it. Think about it; if you work on the production line, you just see trucks coming, one after the other. The computer system assigns builds based on available parts. Just because the build date for my truck or your truck might change every few days (based on computer modeling), that really has zero impact on the production line. Trucks keep rolling, and the folks working don't care whose truck they are building when.
 

Maverstang

2.5L Hybrid
Well-known member
Joined
Jan 27, 2022
Threads
0
Messages
439
Reaction score
826
Location
Texas
Vehicle(s)
Miata; Maverick Lariat Hybrid
Engine
2.5L Hybrid
Clubs
 
Nothing has changed… Nov 14 was the final MY22 production date for hybrids, production has not been extended again. EB final day was the previous Friday.

September 29 is still the first day of scheduling for MY23 units, which will probably start production on Nov 16 or 17, depending on plant maintenance activities. I guess we’ll know that for sure later today.