Build date moved once again...SO FRUSTRATED.

Wolf60625

2.5L Hybrid
Member
First Name
Robert
Joined
May 12, 2022
Threads
1
Messages
7
Reaction score
3
Location
Romeoville IL
Vehicle(s)
2022 Maverick Hybrid Lariat and 2007 Saab 9.3 2.0T and 2018 Kia Sedona
Engine
2.5L Hybrid
Just wanted to share. Ordered my Hybrid Maverick on 9/30/2021. I know Ford is not great at communication, I get that. But I get an email telling me that my build date is the week of 6/7/2022... on 6/10/2022 I get an email stating that my build date has been moved to the week of 6/27/2022. And last night 6/28/2022 I get a new email letting me know that my build date if moved again... this time to 7/25/2022. What the heck is going on over there!!! I wonder at what date my 2022 truck will become a 2023?
Sponsored

 

Eldoramav

2.5L Hybrid
New member
First Name
Paul
Joined
May 16, 2022
Threads
1
Messages
4
Reaction score
2
Location
Colorado
Vehicle(s)
23 xlt
Engine
2.5L Hybrid
I Feel your pain! My September 16 Hybrid XLT no other options order got a initial build date of May 24th moved to May 27th, moved to June 27th moved to July 4th.... waiting for same email as yours.
 

KevCuRaoi

2.5L Hybrid
Well-known member
First Name
Kevin
Joined
Jan 20, 2022
Threads
0
Messages
1,782
Reaction score
2,456
Location
Buffalo, NY
Vehicle(s)
2025 Maverick Hybrid XLT AWD
Engine
2.5L Hybrid
Just wanted to share. Ordered my Hybrid Maverick on 9/30/2021. I know Ford is not great at communication, I get that. But I get an email telling me that my build date is the week of 6/7/2022... on 6/10/2022 I get an email stating that my build date has been moved to the week of 6/27/2022. And last night 6/28/2022 I get a new email letting me know that my build date if moved again... this time to 7/25/2022. What the heck is going on over there!!! I wonder at what date my 2022 truck will become a 2023?
It is very common for build dates to jump around. For retail and stock units. Mine was pushed back 3 times, and then bumped up twice (to just a little later than it was originally).

People complain when they don't get enough updates from Ford. And other people complain when they get too many updates from Ford. Build dates change. It is common and normal. If a shipment of X part was delayed, they can't build certain vehicles, so those are moved.

If you have a build date, your truck will be a 2022. They are building 22s through most of October.
 

Sponsored

Philemon

2.0L EcoBoost
Well-known member
First Name
Kyle
Joined
Jan 3, 2022
Threads
6
Messages
97
Reaction score
94
Location
UP Michigan
Vehicle(s)
2022 Maverick XLT FX4
Engine
2.0L EcoBoost
Hoping they actually build mine this week. Haven't seen a delay email so checking daily to see if my modules page is populated
 

Terrenceyao

2.5L Hybrid
Well-known member
First Name
Terrence
Joined
Aug 6, 2021
Threads
3
Messages
63
Reaction score
71
Location
California
Vehicle(s)
Cactus grey 2022 hybrid maverick XLT lux
Engine
2.5L Hybrid
And to set your expectations, be ready to have your ship date move around also. I didn’t get my build date move around, but my original delivery date was missed and the following week I got an email update from ford on a new delivery eta. So yeah, don’t put too much stock on the dates you’re given, you’ll only set yourself up for disappointment.
 

Wolfe Jet

2.5L Hybrid
Well-known member
Joined
Aug 21, 2021
Threads
4
Messages
161
Reaction score
372
Location
VA
Vehicle(s)
‘22 Hybrid Lariat
Engine
2.5L Hybrid
I'm in the same boat, as my sig shows... back into "In Production" today, so my roller coaster begins the uphill climb once again.
 

beardedbender

2.5L Hybrid
Member
First Name
Spencer
Joined
Jan 5, 2022
Threads
2
Messages
19
Reaction score
5
Location
Connecticut
Vehicle(s)
Maverick
Engine
2.5L Hybrid
Ordered 9/22/21 Hybrid Lariat Lux

Scheduled: 5/30, moved to 6/6, 6/27, 7/5

I am now listed as in production for the second time even though 7/5 hasn't come.
 

inthecabin

2.5L Hybrid
Well-known member
First Name
Andy
Joined
Sep 27, 2021
Threads
20
Messages
641
Reaction score
826
Location
California
Vehicle(s)
2021 Ranger Lariat FX4
Engine
2.5L Hybrid
Clubs
 
Just wanted to share. Ordered my Hybrid Maverick on 9/30/2021. I know Ford is not great at communication, I get that. But I get an email telling me that my build date is the week of 6/7/2022... on 6/10/2022 I get an email stating that my build date has been moved to the week of 6/27/2022. And last night 6/28/2022 I get a new email letting me know that my build date if moved again... this time to 7/25/2022. What the heck is going on over there!!! I wonder at what date my 2022 truck will become a 2023?
I ordered 5 days earlier than you and I’ve had the same scheduling times as you. Yep now 7/25 for me too.
 
Sponsored

JohnHartshorn

2.5L Hybrid
Well-known member
First Name
John
Joined
Jul 30, 2021
Threads
8
Messages
358
Reaction score
440
Location
Metro St Louis
Vehicle(s)
21 Toyota Sienna XSE - Mav Hybrid XLT LUX Area 51
Engine
2.5L Hybrid

JohnHartshorn

2.5L Hybrid
Well-known member
First Name
John
Joined
Jul 30, 2021
Threads
8
Messages
358
Reaction score
440
Location
Metro St Louis
Vehicle(s)
21 Toyota Sienna XSE - Mav Hybrid XLT LUX Area 51
Engine
2.5L Hybrid
Just wanted to share. Ordered my Hybrid Maverick on 9/30/2021. I know Ford is not great at communication, I get that. But I get an email telling me that my build date is the week of 6/7/2022... on 6/10/2022 I get an email stating that my build date has been moved to the week of 6/27/2022. And last night 6/28/2022 I get a new email letting me know that my build date if moved again... this time to 7/25/2022. What the heck is going on over there!!! I wonder at what date my 2022 truck will become a 2023?
At least you're getting emails. The only way I find out my build date has changed is by calling or chatting with Ford. Started out as a 27 Jun, now a 15 Aug. Scuttlebut from Tim Bartz is if you have a 22 VIN, you're getting a 22 (even if they have to delay the changeover).
 

Dawgonit

2.5L Hybrid
Well-known member
First Name
Gary
Joined
Feb 14, 2022
Threads
2
Messages
88
Reaction score
153
Location
NC
Vehicle(s)
Ford maverick Hybrid
Engine
2.5L Hybrid
I ordered hybrid xlt Oct. 23 got vin and build week of 6/20 then 6/27 then went back to in processing with possible 8/1 week. Today I got email of 7/4. I'm hoping getting the email just days from the actual start week may be a good sign.
 

Cannedtunafishisgood

Banned
Banned
Joined
Jun 11, 2022
Threads
2
Messages
187
Reaction score
248
Location
ID
Vehicle(s)
Many
I follow a Toyota Sienna group and their build dates are being pushed out too.
Toyota doesnt accept custom orders. A dealer can request options/models but it has no ties to a customer. So there builds is not getting pushed cause they dont have one.