- Thread starter
- #1
My Maverick was supposedly built in February along with 591 other ones making a total of 592 Trucks. It is a Lariat with most options except Luxury Package.
I was given an expected delivery date , and BCE Modules were loaded , but no PCM Modules were loaded.
Then , my delivery was cancelled , and absolute silence . Does anyone else in the ' 592 ' group have any of these issues ?
I was given an expected delivery date , and BCE Modules were loaded , but no PCM Modules were loaded.
Then , my delivery was cancelled , and absolute silence . Does anyone else in the ' 592 ' group have any of these issues ?
Sponsored