Sponsored

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
42
Messages
1,890
Reaction score
2,014
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
Saw this posted by someone on one of the Facebook groups. If you are in this group, feel free to take credit.

If this is accurate, then it looks like 8/4 is the last scheduling date for the Maverick which makes sense given the two months advance scheduling time.

Ford Maverick 2022 Maverick Final Scheduling Cut Off Date = August 4 Screen Shot 2022-06-26 at 10.07.53 AM
Sponsored

 

Cannedtunafishisgood

Banned
Banned
Joined
Jun 11, 2022
Threads
2
Messages
187
Reaction score
240
Location
ID
Vehicle(s)
Many
Does this mean (if true) that you can get a schedule date up until 8/4 and get a 2022? Then after that it will be a 2023?
 

MiBoMa

2.5L Hybrid
Well-known member
Joined
Apr 14, 2022
Threads
2
Messages
79
Reaction score
56
Location
Florida
Vehicle(s)
Edge
Engine
2.5L Hybrid
Our build date is 8/15
That's version 4!
 
OP
OP
skadizzle

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
42
Messages
1,890
Reaction score
2,014
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
Our build date is 8/15
That's version 4!
8/4 isn't the last scheduled build date, it's the last date orders will be scheduled. This week they were scheduling for 8/15- 8/22. So in 8/4 they will schedule late October. If it's true, then anyone not scheduled that week will be a 2023.
 

Mspi

2.5L Hybrid
Well-known member
First Name
Mspi
Joined
Jan 27, 2022
Threads
8
Messages
56
Reaction score
100
Location
Texas
Vehicle(s)
2022 Lariat Maverick
Engine
2.5L Hybrid
8/4 isn't the last scheduled build date, it's the last date orders will be scheduled. This week they were scheduling for 8/15- 8/22. So in 8/4 they will schedule late October. If it's true, then anyone not scheduled that week will be a 2023.
I'm confused !! 😕
 

Sponsored

OP
OP
skadizzle

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
42
Messages
1,890
Reaction score
2,014
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 

bbhaag

Well-known member
Joined
Jul 21, 2021
Threads
14
Messages
1,507
Reaction score
2,728
Location
Illinois
Vehicle(s)
Maverick XLT, Mustang Mach-E GT Performance
Engine
Undecided

Mspi

2.5L Hybrid
Well-known member
First Name
Mspi
Joined
Jan 27, 2022
Threads
8
Messages
56
Reaction score
100
Location
Texas
Vehicle(s)
2022 Lariat Maverick
Engine
2.5L Hybrid
If you don't have a VIN by 8/4 then you won't be getting a 2022 Maverick.
I dont have a build date, I'm a confirmed order 7/07/21 Order Lariat, lux, co pilot oxy white, order still waiting to be scheduled. Tim the video guy mentioned in one of his videos all June July and Aug orders will be 2022 and build up to October 2022. And Sept 2021 and up will ve 2023. Unless its all changed.
 
OP
OP
skadizzle

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
42
Messages
1,890
Reaction score
2,014
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
I dont have a build date, I'm a confirmed order 7/07/21 Order Lariat, lux, co pilot oxy white, order still waiting to be scheduled. Tim the video guy mentioned in one of his videos all June July and Aug orders will be 2022 and build up to October 2022. And Sept 2021 and up will ve 2023. Unless its all changed.
No one knows what last order date will be scheduled because it's all based on constraints. As mentioned above.l, the main thing to take out of it is, if you don't have a VIN or a build date by 8/4/22 then you will be a 23 MY.
 

JsnMrd

2.5L Hybrid
Well-known member
Joined
Jun 26, 2021
Threads
41
Messages
577
Reaction score
580
Location
SoCal
Vehicle(s)
2016 Honda Civic Touring
Engine
2.5L Hybrid
If your order gets rolled to 2023, will they build it like a 2022 and just call it 2023 or with updated 2023 features?
 
Sponsored

MortyHooper

2.5L Hybrid
Well-known member
First Name
Matt
Joined
Oct 18, 2021
Threads
6
Messages
361
Reaction score
349
Location
Vancouver
Vehicle(s)
2007 Matrix
Engine
2.5L Hybrid
I'm confused !! 😕
There is lead time, so June scheduling means august builds. August scheduling means October builds. 2023 builds start in late October, so if you aren’t scheduled by the first week of August, apparently you aren’t getting a 2022.
 

fordvideoguy

Well-known member
First Name
Tim
Joined
Jul 10, 2021
Threads
123
Messages
1,827
Reaction score
6,799
Location
Salina, KS
Website
www.long-mcarthur.com
Vehicle(s)
2022 F-150 Lightning, 2021 Ford Bronco
Engine
Undecided
I dont have a build date, I'm a confirmed order 7/07/21 Order Lariat, lux, co pilot oxy white, order still waiting to be scheduled. Tim the video guy mentioned in one of his videos all June July and Aug orders will be 2022 and build up to October 2022. And Sept 2021 and up will ve 2023. Unless its all changed.
As long as you don't have constraint items outside of those and you have an approved order.
 

Portcqb

2.0L EcoBoost
Well-known member
First Name
Eric
Joined
Aug 9, 2021
Threads
12
Messages
483
Reaction score
545
Location
South Portland, ME
Vehicle(s)
2022 Ford Maverick XLT Lux 2.0 AWD
Engine
2.0L EcoBoost
If your order gets rolled to 2023, will they build it like a 2022 and just call it 2023 or with updated 2023 features?
If all the options selected are the same in 23 it would basically stay unchanged but if say your selected color isn't available you would have to change it.
 
OP
OP
skadizzle

skadizzle

2.5L Hybrid
Well-known member
Joined
Nov 2, 2021
Threads
42
Messages
1,890
Reaction score
2,014
Location
Orlando, Florida
Vehicle(s)
2023 Ford Maverick Lariat BAP
Engine
2.5L Hybrid
Clubs
 
As long as you don't have constraint items outside of those and you have an approved order.
Tim, did you happen to see this before? It looks like it was dated in May. Not sure if it's a vendor or who they are.
Sponsored

 
 




Top