Sponsored

When is the last week of production or scheduling?

Silvehand21

2.5L Hybrid
New member
First Name
Matthew
Joined
Apr 7, 2022
Threads
1
Messages
2
Reaction score
0
Location
Rochester Hills, MI
Vehicle(s)
1999 Ford Contour sport
Engine
2.5L Hybrid
Sorry if this is posted somewhere but I feel like I'm not going to make the cut and I'm wondering how close to getting pushed to 2023 I am.

Ordered 8/13 Hybrid lariat, lux package, copilot 360, Area 51
Sponsored

 

WannaMav

2.5L Hybrid
Well-known member
Joined
Oct 9, 2021
Threads
78
Messages
902
Reaction score
1,404
Location
Hawaii
Vehicle(s)
2022 Maverick hybrid
Engine
2.5L Hybrid
Currently, last day of production for '22 models is anticipated for late October (sometime during the week of Oct. 18th, if I recall correctly).

Judging by the usual lead time on receiving a scheduled build week that would translate to scheduling winding down during August.
 
 







Top