In July I was given Aug 19 for production week. EMail on 8/12 It was changed to Aug.29. EMail 8/24 pushed back to Sept. 5th. Today's email 8/31 pushed it back to Sept. 19th.
This is a Velocity Blue eb bare bones XL + tow package only, nothing else on it. Can't wait for the next email in 12 days pushing it into Oct..
Sponsored

 

projectvortex

Well-known member
Joined
Oct 19, 2021
Threads
2
Messages
880
Reaction score
1,597
Location
.
Vehicle(s)
.
Engine
Undecided
In July I was given Aug 19 for production week. EMail on 8/12 It was changed to Aug.29. EMail 8/24 pushed back to Sept. 5th. Today's email 8/31 pushed it back to Sept. 19th.
This is a Velocity Blue eb bare bones XL + tow package only, nothing else on it. Can't wait for the next email in 12 days pushing it into Oct..
Original build week end of July. Now I am into October! The ONLY way I find out is via chat with customer service. I’m about to buy a Santa Cruz I think.
 
OP
OP
Clock Doc

Clock Doc

2.0L EcoBoost
Well-known member
First Name
Tim
Joined
Jul 1, 2022
Threads
12
Messages
434
Reaction score
656
Location
Mass
Vehicle(s)
Ford Maverick 2.0 ecoboost, Ford Crown Victoria
Engine
2.0L EcoBoost
Clubs
 
I'm about to buy a Santa Cruz I think.
Can't say I blame you! That veh doesn't work for my needs so I'll wait it out. Looked at used Rangers and others but they want more for one with 100k+ than the maverick is new.
 

oilman300

2.5L Hybrid
Well-known member
First Name
Mike
Joined
Oct 25, 2021
Threads
8
Messages
332
Reaction score
332
Location
Georgia
Vehicle(s)
2022 Velocity Blue XL Hybrid
Engine
2.5L Hybrid
In July I was given Aug 19 for production week. EMail on 8/12 It was changed to Aug.29. EMail 8/24 pushed back to Sept. 5th. Today's email 8/31 pushed it back to Sept. 19th.
This is a Velocity Blue eb bare bones XL + tow package only, nothing else on it. Can't wait for the next email in 12 days pushing it into Oct..
My XL hybrid order was pushed back 4 times before it went into production today. I have a 9/7 build day.
 

Decayed

2.0L EcoBoost
Well-known member
First Name
yes
Joined
Oct 18, 2021
Threads
51
Messages
3,358
Reaction score
5,210
Location
Directly above the center of the Earth
Vehicle(s)
a car
Engine
2.0L EcoBoost
Hmm, ecoboost. Wonder what the holdup is? What was your order date? Any constraints?
 

Sponsored

OP
OP
Clock Doc

Clock Doc

2.0L EcoBoost
Well-known member
First Name
Tim
Joined
Jul 1, 2022
Threads
12
Messages
434
Reaction score
656
Location
Mass
Vehicle(s)
Ford Maverick 2.0 ecoboost, Ford Crown Victoria
Engine
2.0L EcoBoost
Clubs
 
01/12/22 Just what I said in my post. Nothing in this truck but the tow package.
 
OP
OP
Clock Doc

Clock Doc

2.0L EcoBoost
Well-known member
First Name
Tim
Joined
Jul 1, 2022
Threads
12
Messages
434
Reaction score
656
Location
Mass
Vehicle(s)
Ford Maverick 2.0 ecoboost, Ford Crown Victoria
Engine
2.0L EcoBoost
Clubs
 
My XL hybrid order was pushed back 4 times before it went into production today. I have a 9/7 build day.
I've been in production since July. Pushed 4 times with no constraints at all on Veh. Just waiting on the 5th push back in 10-12 days.
I know it's gonna be built but I'd like it before new year's lol
 

FriscoTXJoe

2.5L Hybrid
Banned
Banned
First Name
Joe
Joined
Aug 25, 2021
Threads
27
Messages
983
Reaction score
2,404
Location
75033
Vehicle(s)
2022 Maverick Lariat
Engine
2.5L Hybrid
Clubs
 
Do yourself a favor and stop worrying about it. Seriously.

Mine did the same thing. And then the shipping took long too.

Guess what. Neither of us controls it. So why worry about it?

You will enjoy your truck. Great vehicle.
 
OP
OP
Clock Doc

Clock Doc

2.0L EcoBoost
Well-known member
First Name
Tim
Joined
Jul 1, 2022
Threads
12
Messages
434
Reaction score
656
Location
Mass
Vehicle(s)
Ford Maverick 2.0 ecoboost, Ford Crown Victoria
Engine
2.0L EcoBoost
Clubs
 
My XL hybrid order was pushed back 4 times before it went into production today. I have a 9/7 build day.
Do yourself a favor and stop worrying about it.
Thanks FriscoTXJ, Oilman, Not worried just more of what the hell is pushing it out. Not hybrid and no constraints at all. Just perplexed at this time. It would be nice if there was more info as to the why but that's not gonna happen. I'll be more suprised at the email telling me it's built. Lol
 
Last edited:

FriscoTXJoe

2.5L Hybrid
Banned
Banned
First Name
Joe
Joined
Aug 25, 2021
Threads
27
Messages
983
Reaction score
2,404
Location
75033
Vehicle(s)
2022 Maverick Lariat
Engine
2.5L Hybrid
Clubs
 
Communication on production and delivery is not at the same level as the design staff that made the Maverick, that is for sure!!!!!!!!!
Sponsored

 
 







Top