Sponsored

Production Date Adjustments x6

saweber

2.5L Hybrid
New member
Joined
Sep 26, 2022
Threads
1
Messages
2
Reaction score
0
Location
Indianapolis, IN
Vehicle(s)
Honda Element, Honda Pilot
Engine
2.5L Hybrid
My 2022 Maverick LARIAT was been scheduled for production the weeks of:
  • September 26, 2022
  • October 10, 2022
  • October 17, 2022
  • October 31, 2022
  • November 21, 2022.
It is now schedule for the week of December 19, 2022. Has anyone else had their build date moved this much?
Sponsored

 

paneubert

2.5L Hybrid
Well-known member
Joined
Jan 17, 2022
Threads
34
Messages
2,866
Reaction score
4,835
Location
Seattle
Vehicle(s)
2025 Hybrid XLT/4K/AWD/CoPilot/Eruption Green
Engine
2.5L Hybrid
Your 22 is not being built. Final 22 production is this week. I think today or tomorrow actually. I'm on my phone so can't find the related threads on here, but look around and see.

You need to see if your dealer properly got your order set up as a 23 in the system. There should be a new 23 order that Ford made for you. They then canceled your 22 order. You need to get with your dealer to have them change your priority code from 99 to something between 10 and 19.
 

paneubert

2.5L Hybrid
Well-known member
Joined
Jan 17, 2022
Threads
34
Messages
2,866
Reaction score
4,835
Location
Seattle
Vehicle(s)
2025 Hybrid XLT/4K/AWD/CoPilot/Eruption Green
Engine
2.5L Hybrid
 







Top