Sponsored

Pizza tracker question

Sirjohn

2.0L EcoBoost
Banned
Banned
Joined
Jul 28, 2022
Threads
14
Messages
139
Reaction score
129
Location
yes
Vehicle(s)
'78 Slab
Engine
2.0L EcoBoost
  • Thread starter
  • Banned
  • #1
Got an email just now the build date was just moved up a week from the original email on that came on 6/15/23. However the pizza track hasn’t hasn’t moved.

not really putting a lot of faith or attention into these things, but was wondering if anyone else noticed the same?
Sponsored

 

tdonch

2.5L Hybrid
Well-known member
First Name
Tom
Joined
Aug 21, 2022
Threads
3
Messages
337
Reaction score
380
Location
East Central Florida
Vehicle(s)
2018 Subaru Forester (current toad)
Engine
2.5L Hybrid
Got an email just now the build date was just moved up a week from the original email on that came on 6/15/23. However the pizza track hasn’t hasn’t moved.

not really putting a lot of faith or attention into these things, but was wondering if anyone else noticed the same?
I believe the tracker does not update to a status of "In Production" until roughly a week before the vehicle actually begins to roll down the assembly line. When is your production week?
 
OP
OP

Sirjohn

2.0L EcoBoost
Banned
Banned
Joined
Jul 28, 2022
Threads
14
Messages
139
Reaction score
129
Location
yes
Vehicle(s)
'78 Slab
Engine
2.0L EcoBoost
  • Thread starter
  • Banned
  • #3
The new date is 7/24/23

original date was 7/31/23
 

mattmckrell

2.5L Hybrid
Member
First Name
Matt
Joined
May 8, 2023
Threads
0
Messages
10
Reaction score
25
Location
Cary, NC
Vehicle(s)
Ford Escape, Toyota Highlander, Winnebago
Engine
2.5L Hybrid
Clubs
 
Beats me. My Pizza Tracker still just says "Order Confirmed" (I got the email on 6/15 too, with the same 7/31 build date). However, my Ford Account does finally show the Maverick order, with it listed as "In Production". So, take your pick of status! LOL At least I have a VIN!

Oh, and the "View Details" link on my account give "Access Denied". Sigh.
 

mav_kev

2.0L EcoBoost
Well-known member
Joined
Aug 15, 2022
Threads
0
Messages
258
Reaction score
596
Location
PA
Vehicle(s)
Mav
Engine
2.0L EcoBoost
I would say the pizza tracker is not as linear as it appears, but if changes are happening, that seems to be positive. My build week/date bounced around a few times, settled on the 21st, but then wasn't actually built until 22nd. It's now awaiting shipment.
 

Sponsored

tdonch

2.5L Hybrid
Well-known member
First Name
Tom
Joined
Aug 21, 2022
Threads
3
Messages
337
Reaction score
380
Location
East Central Florida
Vehicle(s)
2018 Subaru Forester (current toad)
Engine
2.5L Hybrid
The new date is 7/24/23

original date was 7/31/23
I did not notice my tracker page getting updated until roughly a week before it went down the assembly line. At that point, I believe they sent the plant our VIN to prepare for assembly. Then the "In Production" status "lit up" with no date. A few days later the Window sticker was available. The "In Production" finally received a date on the Monday following our assigned build week date and the next day updated to a "Built" status.

Sounds like the dates "popping" differs for each Maverick that comes down the line.

Ford Maverick Pizza tracker question Progress meter shows shipped
 

MiMav

2.0L EcoBoost
Well-known member
Joined
Sep 30, 2022
Threads
2
Messages
96
Reaction score
142
Location
Michigan
Vehicle(s)
'14 Escape, '09 Flex
Engine
2.0L EcoBoost
My email updates (when sent) generally followed the pizza tracker updates by a day. My experience is:
- Original scheduled week of 6/19/2023, via email and tracker.
- First update to week of 6/12/2023, via email and tracker.
- Several changes to scheduled week varying from 6/13/2023 to 6/24/2023, only 1 change reported via email.
- On 6/15/2023 the scheduled week changed to 6/23/2023.
- On 6/16/2023 the tracker showed in production and the window sticker became available.
- Late night 6/26/2023 the tracker updated to built.
- Late night 6/27/2023 a built email was sent.

It looks like the dates are just estimates until the window sticker is generated and the tracker shows in production, which as others have indicated is about a week before actual production.
Sponsored

 
 




Top