Sponsored

My 5th delay - kicked back by a week to 8/1 build week

inthecabin

2.5L Hybrid
Well-known member
First Name
Andy
Joined
Sep 27, 2021
Threads
20
Messages
641
Reaction score
826
Location
California
Vehicle(s)
2021 Ranger Lariat FX4
Engine
2.5L Hybrid
Clubs
 
It’s my 5th delay and kicked back by only a week for 8/1 build week.

Still so close but “oh you almost got it”.
Sponsored

 

Hammerfyst

2.5L Hybrid
New member
Joined
Sep 25, 2021
Threads
0
Messages
3
Reaction score
0
Location
Longwood, Fl
Vehicle(s)
Maverick Lariat
Engine
2.5L Hybrid
I just got the same email. Only 4 delays for me...so far...
 

Mxer97

2.5L Hybrid
Well-known member
First Name
R
Joined
Oct 4, 2021
Threads
51
Messages
409
Reaction score
428
Location
H town
Vehicle(s)
2023 mav xlt
Engine
2.5L Hybrid
It’s my 5th delay and kicked back by only a week for 8/1 build week.

Still so close but “oh you almost got it”.
What was your original build week?
 

ZDesorm

2.0L EcoBoost
Well-known member
First Name
Zack
Joined
Jun 8, 2022
Threads
0
Messages
47
Reaction score
39
Location
Ontario, Canada
Vehicle(s)
Ford Escape SE, Sport Pkg. 1.5 L EB.
Engine
2.0L EcoBoost
Unfortunately it doesn’t seem to get better once it is built and shipped. On my 6th delivery estimate delay currently.
Same here! It's built and it is now sitting in a railyard 4 hrs from my place (Been there for almost two weeks). The delivery date has changed four times now.
 

Sponsored

FabMav

2.5L Hybrid
Well-known member
First Name
JR
Joined
Nov 7, 2021
Threads
22
Messages
275
Reaction score
292
Location
CA
Vehicle(s)
XL
Engine
2.5L Hybrid
Clubs
 
I too got my 5th delay to 8/1 production yesterday on my XL hybrid with only a moonroof and hitch as options. I ordered on 10/1/22 and don’t expect delivery until I join the 1 year club. I’m sure I can look forward to further delays.
 

Mxer97

2.5L Hybrid
Well-known member
First Name
R
Joined
Oct 4, 2021
Threads
51
Messages
409
Reaction score
428
Location
H town
Vehicle(s)
2023 mav xlt
Engine
2.5L Hybrid
Mid April.
I was assigned a week in April, and pushed to august 1, but not an actual build week in April, that would have probably been assigned in March?
 

adsandiego

2.5L Hybrid
Well-known member
First Name
Tony
Joined
Oct 7, 2021
Threads
59
Messages
400
Reaction score
1,002
Location
San Diego
Vehicle(s)
'24 MAV
Engine
2.5L Hybrid
Hybrid XL, CP360, rear window, CG
Ordered 9/24/21
Scheduled: 6/13, 6/20, 6/27, 8/1
 
OP
OP
inthecabin

inthecabin

2.5L Hybrid
Well-known member
First Name
Andy
Joined
Sep 27, 2021
Threads
20
Messages
641
Reaction score
826
Location
California
Vehicle(s)
2021 Ranger Lariat FX4
Engine
2.5L Hybrid
Clubs
 
I was assigned a week in April, and pushed to august 1, but not an actual build week in April, that would have probably been assigned in March?
In that logic yes but Ford’s logic???
 
Sponsored

Mxer97

2.5L Hybrid
Well-known member
First Name
R
Joined
Oct 4, 2021
Threads
51
Messages
409
Reaction score
428
Location
H town
Vehicle(s)
2023 mav xlt
Engine
2.5L Hybrid
Hybrid XL, CP360, rear window, CG
Ordered 9/24/21
Scheduled: 6/13, 6/20, 6/27, 8/1
Those were my build weeks as well, I checked with chat yesterday and have been tentatively scheduled for 8/5 build….
 

adsandiego

2.5L Hybrid
Well-known member
First Name
Tony
Joined
Oct 7, 2021
Threads
59
Messages
400
Reaction score
1,002
Location
San Diego
Vehicle(s)
'24 MAV
Engine
2.5L Hybrid
Those were my build weeks as well, I checked with chat yesterday and have been tentatively scheduled for 8/5 build….
Hopefully, mine will be the one right in front of yours on the production line :)
Sponsored

 
 







Top