Sponsored

How long before taking delivery?

witzend

2.5L Hybrid
Member
First Name
Wes
Joined
Nov 20, 2021
Threads
2
Messages
12
Reaction score
4
Location
Sewanee, Tennessee
Vehicle(s)
2013 Cadillac SUV, 2022 Ford Maverick XLT
Engine
2.5L Hybrid
Just received an email for Ford that my Maverick is going into production on Sept. 5th. So how long do you think it will take from the time of production to delivery? I already waited a year so I just curious about the time frame.
Sponsored

 

Scott Asheville

2.0L EcoBoost
Well-known member
First Name
Scott
Joined
Oct 4, 2021
Threads
79
Messages
2,323
Reaction score
5,451
Location
Asheville, NC
Vehicle(s)
2022 AWD XLT ECO LUX CP360 HPR
Engine
2.0L EcoBoost
Lots of threads there that answer your question. The answer seems to be different for every order, because the whole industrial system remains in a chaotic state. The most common answer is 6 weeks from built to delivered. And the build date can slip weeks to months. Build can take one week to several weeks, and even longer if there's a 6th recall.
 

raymaines

2.5L Hybrid
Well-known member
First Name
Ray
Joined
Sep 27, 2021
Threads
33
Messages
690
Reaction score
1,051
Location
Tacoma, Washington
Vehicle(s)
Alto Blue Lariat Lux Hybrid
Engine
2.5L Hybrid
Clubs
 
What Scott said. Six to eight weeks for delivery after it rolls off the assembly line is a common answer and nobody seems to spend any time disputing it, but every truck is different. How lucky do you feel?
Sponsored

 
 







Top