I’m in a similar situation as you. Off by a week or so. Blend date 11/29. Production date 12/7. Still in production. No modules and still the same delivery date estimate of 1/12. I don’t see that happening.Ya
ya, if I had a built email or the modules show active I would be more hopeful. Without Those two things I’m feeling less optimistic.
Sponsored