Sponsored

average number of rescheduling dates

Bamajim

2.5L Hybrid
Well-known member
First Name
Jim
Joined
Oct 28, 2021
Threads
8
Messages
341
Reaction score
476
Location
Athens Al
Vehicle(s)
Ram1500. Ford Flex
Engine
2.5L Hybrid
I am on number 6. First was 9/26, then 10/24 ,then 10/3 ,then 10/10 ,then 10/17, with a actual build date of 10/17. Got the email last night moving it to 10/31.
Sponsored

 
OP
OP

1Mtmary

2.0L EcoBoost
Well-known member
First Name
Mary
Joined
Jan 3, 2022
Threads
5
Messages
58
Reaction score
33
Location
1Massage$
Vehicle(s)
Chevy spark
Engine
2.0L EcoBoost
Mine changed 5 times and was delayed about 2 1/2 months before it was finally built. I have a hybrid Lariat with lux pkg and CP 360. Hope you have a better experience.
thank you
 

dale

2.5L Hybrid
Well-known member
First Name
dale
Joined
Jul 20, 2021
Threads
8
Messages
134
Reaction score
138
Location
Maryland
Vehicle(s)
2007 saturn sky redline
Engine
2.5L Hybrid
My build week has changed six times - so far. From 10/17 to 10/24 to 10/17 to 10/24 to 10/31 to 11/7 to the current 11/14.
My scheduled day changed 9 times since June 2021. Sent to plant changed once for a month
 

RRaynor2

2.0L EcoBoost
Well-known member
Joined
Jan 20, 2022
Threads
13
Messages
186
Reaction score
302
Location
California
Vehicle(s)
2022 Maverick Lariat
Engine
2.0L EcoBoost
Got my fourth delay today via Ford chat. They did narrow it down to a day (10/21/22). We'll see
 
 







Top