I was pleased and excited to see my Lariat AWD going into production week of 1/13/2025. Since Ford is in these forums I was wondering if some more info might be available. For example:

1) Is this the first, second or third run?
2) Is there a chance it may be sooner?
3) Once built and shipped, how long does it usally take to arrive at the dealer. I'm in NorCal and my dealer is Walnut Creek Ford.

Thanks in advance!

Ford Maverick VIN & Production Week scheduled 1733432324586-3s
Sponsored

 

Packer Bill

2.0L EcoBoost
Well-known member
First Name
Bill
Joined
Jun 21, 2021
Threads
10
Messages
1,928
Reaction score
2,593
Location
South Dakota
Vehicle(s)
2019 Mazda CX-5, 2025 Ford Maverick
Engine
2.0L EcoBoost
I am not sure what you mean by runs. Production of 25 Mavericks started week of 11/11/2024.

It is always possible to get rescheduled to an earlier date but probably unlikely.

After it is built, it could anywhere from 2-6 weeks to make it to the dealer's lot...lots of variables involved.
 
OP
OP
dmo94556

dmo94556

2.5L Hybrid
Well-known member
First Name
Darius
Joined
Dec 2, 2024
Threads
3
Messages
60
Reaction score
97
Location
SF Bay Area
Vehicle(s)
2025 Ford Maverick Lariat
Engine
2.5L Hybrid
Clubs
 
I am not sure what you mean by runs. Production of 25 Mavericks started week of 11/11/2024.

It is always possible to get rescheduled to an earlier date but probably unlikely.

After it is built, it could anywhere from 2-6 weeks to make it to the dealer's lot...lots of variables involved.
By runs I intend to refer to the Job runs we've bneen reading about. So far I've seen 1 & 2.
 

Packer Bill

2.0L EcoBoost
Well-known member
First Name
Bill
Joined
Jun 21, 2021
Threads
10
Messages
1,928
Reaction score
2,593
Location
South Dakota
Vehicle(s)
2019 Mazda CX-5, 2025 Ford Maverick
Engine
2.0L EcoBoost
By runs I intend to refer to the Job runs we've bneen reading about. So far I've seen 1 & 2.
Currently we are on job 1 (run 1). Job 2 (run 2) production starts on 2/3/2025.