I ordered this Maverick in July of 2021…
2022 First Edition, Hybrid
It took until 4/8/2022 to get scheduled…It was re-scheduled 6 times — finally getting built on 7/5/2022…
It then sat in Mexico for a month waiting a shipment schedule, which it received on 8/3/2022.
…which was then re-scheduled 5 times…
It finally arrived at my dealer on Columbus day…10/10/2022. I went the moment the wheels touched Texas pavement to take delivery…
Only to find (after 5 hours and all the paper work complete) that the vehicle could not be sold to me due to the side airbag recall. And that I would have to wait until parts were available to do the recall…
…so, I waited ANOTHER 3-4 months while it sat in my dealer’s show room. I would visit it several times a week and dream…
— But I finally made it. It took 568 days…but I’ve now had it for two weeks, and I love it so much.
2022 First Edition, Hybrid
It took until 4/8/2022 to get scheduled…It was re-scheduled 6 times — finally getting built on 7/5/2022…
It then sat in Mexico for a month waiting a shipment schedule, which it received on 8/3/2022.
…which was then re-scheduled 5 times…
It finally arrived at my dealer on Columbus day…10/10/2022. I went the moment the wheels touched Texas pavement to take delivery…
Only to find (after 5 hours and all the paper work complete) that the vehicle could not be sold to me due to the side airbag recall. And that I would have to wait until parts were available to do the recall…
…so, I waited ANOTHER 3-4 months while it sat in my dealer’s show room. I would visit it several times a week and dream…
— But I finally made it. It took 568 days…but I’ve now had it for two weeks, and I love it so much.