Sponsored

Anyone else with a 3/7 Production Date Pushed Back?

Mymaverick2021

2.5L Hybrid
Well-known member
First Name
Steveo
Joined
Sep 18, 2021
Threads
15
Messages
1,736
Reaction score
1,247
Location
Hilo Hi
Vehicle(s)
Ford Maverick
Engine
2.5L Hybrid
How long ago did you place your hybrid order? I know a lot of people with June/July orders haven’t been scheduled. That’s rough.
6/24/21 have a build date now 🤣 after being bumped a month back to make room for your EcoBoost
Sponsored

 

Mark6510

Active member
First Name
Mark
Joined
Dec 20, 2021
Threads
6
Messages
44
Reaction score
97
Location
Ohio
Vehicle(s)
Ford Maverick
Curious if it’s by date or build. Was excited to get a 3/7 build date 3 weeks ago. Then I was more excited to receive an email moving my build to 2/21. Then a week later another email saying I was back to 3/7. Tonight, my build got moved back to 3/21. Ordered a Lariat Lux, EB. Any other origins 3/7’s getting moved around? Still better than not having a date, for sure. Just curious who else how many others on this site in the original 3/7 build week have had their production date moved once or twice already.
Yes. My original build date of 3/7 has been pushed to 3/14. Ordered an XL, EB, AWD with Co-Pilot 360 and rear slider.
 

Nightowl

2.5L Hybrid
Well-known member
Joined
Jul 25, 2021
Threads
15
Messages
231
Reaction score
603
Location
seattle wa
Vehicle(s)
2022 Maverick Lariat
Engine
2.5L Hybrid
My build date has moved around a bit:
Ordered: July 8.
Build date: March 7
Build date: April 4
Build date: March 21
Build date March 7

Getting the truck built will be fantastic but until the chips role in, I might just be rushing to join the back of another line.

Ford Maverick Anyone else with a 3/7 Production Date Pushed Back? 1644683216866
 

19redsox67

2.0L EcoBoost
Active member
Joined
Jan 20, 2022
Threads
2
Messages
42
Reaction score
61
Location
Rochester NH
Vehicle(s)
2022 Kona. 2013 Soul
Engine
2.0L EcoBoost
Curious if it’s by date or build. Was excited to get a 3/7 build date 3 weeks ago. Then I was more excited to receive an email moving my build to 2/21. Then a week later another email saying I was back to 3/7. Tonight, my build got moved back to 3/21. Ordered a Lariat Lux, EB. Any other origins 3/7’s getting moved around? Still better than not having a date, for sure. Just curious who else how many others on this site in the original 3/7 build week have had their production date moved once or twice already.
XLT 2.0 FWD LUX
Build day 3/7, moved to 2/21 and last night it was moved to 2/28
 
OP
OP
PIJane

PIJane

Active member
Joined
Sep 2, 2021
Threads
2
Messages
29
Reaction score
45
Location
Boston, MA
Vehicle(s)
Q5

Sponsored

OP
OP
PIJane

PIJane

Active member
Joined
Sep 2, 2021
Threads
2
Messages
29
Reaction score
45
Location
Boston, MA
Vehicle(s)
Q5
My build date has moved around a bit:
Ordered: July 8.
Build date: March 7
Build date: April 4
Build date: March 21
Build date March 7

Getting the truck built will be fantastic but until the chips role in, I might just be rushing to join the back of another line.

1644683216866.png
Hope if it gets moved again, it‘s only moved up and not back!
 

Happy Guy 823

2.5L Hybrid
Well-known member
First Name
Arthur
Joined
Feb 12, 2022
Threads
8
Messages
105
Reaction score
118
Location
46324
Vehicle(s)
Dodge Dakota
Engine
2.5L Hybrid
Ordered August 23
First build date March 7
Then March 28
Now moved up to March 21
 
OP
OP
PIJane

PIJane

Active member
Joined
Sep 2, 2021
Threads
2
Messages
29
Reaction score
45
Location
Boston, MA
Vehicle(s)
Q5

sn00pyguy

2.5L Hybrid
Well-known member
First Name
Sn00pyguy
Joined
Aug 11, 2021
Threads
4
Messages
290
Reaction score
462
Location
Elyria, OH
Vehicle(s)
2020 Outback
Engine
2.5L Hybrid
6/24/21 have a build date now 🤣 after being bumped a month back to make room for your EcoBoost
My production date has been moved several times.
Ordered July 10th Lariat Lux Hybrid
1st prod date-March 7
2nd prod date-April 4
3rd prod date-March 28
4th prod date-March 14 (current prod date)
fingers crossed.
 
Sponsored

Jackhammer

2.0L EcoBoost
Active member
First Name
Jack
Joined
Oct 26, 2021
Threads
1
Messages
25
Reaction score
62
Location
Sebastopol, Texas
Vehicle(s)
22 Maverick XLT 21 Escape
Engine
2.0L EcoBoost
Just got the email from FORD today at about 5pm. My 3/7 production date got pushed back to 3/14. Anyone else? I heard dates have been pushed back then pushed up again.
We have made an adjustment to the production date for your 2022 Maverick XLT. Your vehicle is now scheduled to be built the week of March 28, 2022. I hope this is the last "adjustment" unless it moves up. It was originally scheduled for March 7th then "adjusted" to March 21st now set for the 28th.
 

sjdmav11/5/21

Member
First Name
steve
Joined
Nov 25, 2021
Threads
0
Messages
18
Reaction score
2
Location
California
Vehicle(s)
toyota rav 4 mazdacx-5
Curious if it’s by date or build. Was excited to get a 3/7 build date 3 weeks ago. Then I was more excited to receive an email moving my build to 2/21. Then a week later another email saying I was back to 3/7. Tonight, my build got moved back to 3/21. Ordered a Lariat Lux, EB. Any other origins 3/7’s getting moved around? Still better than not having a date, for sure. Just curious who else how many others on this site in the original 3/7 build week have had their production date moved once or twice already.
 

sjdmav11/5/21

Member
First Name
steve
Joined
Nov 25, 2021
Threads
0
Messages
18
Reaction score
2
Location
California
Vehicle(s)
toyota rav 4 mazdacx-5
We have made an adjustment to the production date for your 2022 Maverick XLT. Your vehicle is now scheduled to be built the week of March 28, 2022. I hope this is the last "adjustment" unless it moves up. It was originally scheduled for March 7th then "adjusted" to March 21st now set for the 28th.
I gave up waiting for the maverick. I needed something to purchase before the maverick waiting/what if game. Got an escape plug in hybrid. A maverick with a plug in option. More HP. Better mileage all around. Yes, more $. No truck bed. I don't need one. It's a nice vehicle. You guys will enjoy your mavericks if you ever get them. Good luck.
 

sjdmav11/5/21

Member
First Name
steve
Joined
Nov 25, 2021
Threads
0
Messages
18
Reaction score
2
Location
California
Vehicle(s)
toyota rav 4 mazdacx-5
I gave up waiting for the maverick. I needed something to purchase before the maverick waiting/what if game. Got an escape plug in hybrid. A maverick with a plug in option. More HP. Better mileage all around. Yes, more $. No truck bed. I don't need one. It's a nice vehicle. You guys will enjoy your mavericks if you ever get them. Good luck.
I have not cancelled my order. Anyone interested in purchasing mine if it ever arrives?
 

KCHahn

2.5L Hybrid
Well-known member
First Name
Keith
Joined
Jun 27, 2021
Threads
14
Messages
305
Reaction score
442
Location
Colorado
Vehicle(s)
Currently drive a 2001 Ford Range Edge 2WD
Engine
2.5L Hybrid
Ordered 6/24. Build date 3/7, pushed to 4/4, and now set for 3/21.
Been there for about a month now.
Sponsored

 
 







Top