Sponsored

SCHEUDULING???

Hingeman

2.5L Hybrid
Well-known member
First Name
Ed
Joined
Jun 30, 2021
Threads
7
Messages
53
Reaction score
65
Location
Goodyear Az
Vehicle(s)
SIlverado
Engine
2.5L Hybrid
I have a question for the group. I got my email on 3/16 saying my order has been acknowledged and that my truck will be scheduled the week of 5/1. Can anyone tell me does that mean they are going to build it the week of 5/1, or they will actually put it on their schedule that week and the build will be set for June or July?

Thanks
Sponsored

 

paneubert

2.5L Hybrid
Well-known member
Joined
Jan 17, 2022
Threads
34
Messages
2,866
Reaction score
4,833
Location
Seattle
Vehicle(s)
2025 Hybrid XLT/4K/AWD/CoPilot/Eruption Green
Engine
2.5L Hybrid
Built the week of 5/1.
 

Dano67

2.5L Hybrid
Well-known member
First Name
Dan
Joined
Oct 28, 2022
Threads
0
Messages
86
Reaction score
86
Location
Veedersburg, IN
Vehicle(s)
2018 Equinox (2023 Hybrid Lariat Lux...some day)
Engine
2.5L Hybrid
Clubs
 
Barring unforeseen other delays, it will be built that week. My original date was 3/20 and it was bumped up to 3/13 and I pick it up tonight. Yours may fluctuate a week or two or even a day or two but you are SCHEDULED for the week of 5/1 for actual production. Good luck!
 

Milqueman

2.5L Hybrid
Well-known member
Joined
Sep 8, 2022
Threads
7
Messages
170
Reaction score
493
Location
Colorado Springs, Colorado
Vehicle(s)
2023 Kia Sportage Hybrid, 2013 Hyundai Elantra
Engine
2.5L Hybrid
It means your vehicle is schedule to be built during the week of 5/1.

When I got my email, it said said scheduled 3/10, then I got another email a week later that said they moved it up to 2/28, but it actually got built the week of 3/6. So expect that your date may change by a week, one way or another. But, you have a date, so that's good.

It takes about a week to build, depending on options. Then about a month or so to get delivered. If I were you, based on a 5/1 schedule date, I would expect it to be delivered to your dealer in mid June.
 
OP
OP
Hingeman

Hingeman

2.5L Hybrid
Well-known member
First Name
Ed
Joined
Jun 30, 2021
Threads
7
Messages
53
Reaction score
65
Location
Goodyear Az
Vehicle(s)
SIlverado
Engine
2.5L Hybrid
It means your vehicle is schedule to be built during the week of 5/1.

When I got my email, it said said scheduled 3/10, then I got another email a week later that said they moved it up to 2/28, but it actually got built the week of 3/6. So expect that your date may change by a week, one way or another. But, you have a date, so that's good.

It takes about a week to build, depending on options. Then about a month or so to get delivered. If I were you, based on a 5/1 schedule date, I would expect it to be delivered to your dealer in mid June.
Thank you
 

Sponsored

OP
OP
Hingeman

Hingeman

2.5L Hybrid
Well-known member
First Name
Ed
Joined
Jun 30, 2021
Threads
7
Messages
53
Reaction score
65
Location
Goodyear Az
Vehicle(s)
SIlverado
Engine
2.5L Hybrid
Barring unforeseen other delays, it will be built that week. My original date was 3/20 and it was bumped up to 3/13 and I pick it up tonight. Yours may fluctuate a week or two or even a day or two but you are SCHEDULED for the week of 5/1 for actual production. Good luck!
Thank you
 

Syntax Error

2.5L Hybrid
Well-known member
Joined
Sep 12, 2022
Threads
15
Messages
707
Reaction score
1,093
Location
SoCal
Vehicle(s)
2023 Lariat Hybrid Carbonized Grey
Engine
2.5L Hybrid
Clubs
 
On a slightly unrelated side note, when does the Ford online tracker show the actual scheduled date? Mine still hasn't populated anything in the progress bar except for order confirmed. The scheduling email said I was scheduled for 5/8.

Ford Maverick SCHEUDULING??? Screenshot_20230408_063013_Brave
 

dcs12345

2.0L EcoBoost
Well-known member
Joined
Sep 17, 2022
Threads
9
Messages
481
Reaction score
488
Location
TX
Vehicle(s)
07 Chevy
Engine
2.0L EcoBoost
On a slightly unrelated side note, when does the Ford online tracker show the actual scheduled date? Mine still hasn't populated anything in the progress bar except for order confirmed. The scheduling email said I was scheduled for 5/8.
the tracker sucks…..it will randomly start working eventually…..maybe. I bet it starts working in the next week of two.


I was originally scheduled for multiple dates the week of March 27th. Then the scheduled date changed to April 19th…. So, you never know if they are going to move you up, keep it the same, or bump you back.
 

Impetus19

2.5L Hybrid
Well-known member
Joined
Sep 6, 2022
Threads
0
Messages
622
Reaction score
669
Location
NJ
Vehicle(s)
2010 Mazda 3, 1979 CJ5 360 3spd, 2015 prius
Engine
2.5L Hybrid
On a slightly unrelated side note, when does the Ford online tracker show the actual scheduled date? Mine still hasn't populated anything in the progress bar except for order confirmed. The scheduling email said I was scheduled for 5/8.

Screenshot_20230408_063013_Brave.png
Mine hasn’t updated either and i got the email with a May 22 scheduled date that I confirmed with my dealer.
 
Sponsored

bridges1992

2.0L EcoBoost
Well-known member
First Name
Caleb
Joined
Sep 30, 2022
Threads
1
Messages
101
Reaction score
45
Location
West Virginia
Vehicle(s)
Corolla
Engine
2.0L EcoBoost
the tracker sucks…..it will randomly start working eventually…..maybe. I bet it starts working in the next week of two.


I was originally scheduled for multiple dates the week of March 27th. Then the scheduled date changed to April 19th…. So, you never know if they are going to move you up, keep it the same, or bump you back.
I was originally scheduled for the same week then the week of April 17th. The other day it said the 22nd and I check today it’s now showing the 21st.
 

dcs12345

2.0L EcoBoost
Well-known member
Joined
Sep 17, 2022
Threads
9
Messages
481
Reaction score
488
Location
TX
Vehicle(s)
07 Chevy
Engine
2.0L EcoBoost
I was originally scheduled for the same week then the week of April 17th. The other day it said the 22nd and I check today it’s now showing the 21st.
Well….look what mine is saying as of today….

Ford Maverick SCHEUDULING??? 85552C03-9F3C-4A2A-B922-C3A62AC89584
 

DuffCon

2.5L Hybrid
Well-known member
Joined
Sep 21, 2022
Threads
15
Messages
189
Reaction score
224
Location
Bay Area, CA
Vehicle(s)
Subaru Ascent
Engine
2.5L Hybrid
Mine is the same as yours today except that it's "build week" of 4/12.
 

JBryant

2.5L Hybrid
Well-known member
First Name
Jesse
Joined
Nov 7, 2022
Threads
33
Messages
1,629
Reaction score
2,709
Location
Bowie, TX
Vehicle(s)
2023 Maverick Lariat Hybrid Alto Blue
Engine
2.5L Hybrid
I have a question for the group. I got my email on 3/16 saying my order has been acknowledged and that my truck will be scheduled the week of 5/1. Can anyone tell me does that mean they are going to build it the week of 5/1, or they will actually put it on their schedule that week and the build will be set for June or July?

Thanks
Looks like you had better be getting ready to pick up a truck in probably early June, if not late May. Like most others, I got a build week, then a build date that flipped back to the first day of the build week, then a sticker about 4 days before the build, then a note is was built, then shipped, and the rest is history. It was 22 days from the build date until it hit the dealer.
Sponsored

 
 







Top