Sponsored

January 3rd build week?

DryHeat

2.5L Hybrid
Well-known member
First Name
DryHeat
Joined
Aug 18, 2021
Threads
8
Messages
1,578
Reaction score
3,439
Location
Arizona
Vehicle(s)
Jeep Patriot
Engine
2.5L Hybrid
Ford Maverick January 3rd build week? 1641658400500

My scheduled build day is today, 1/8/22. My sequence numbers are 116/567.

Ford Maverick January 3rd build week? 1641658509014




Ford's tracking page shows that I am "In Production" but shows no date.

Is anyone else in the same or similar position? If so, have you received any kind of notifications about your build?


(How about you, @Deep ... any word on yours?)
Sponsored

 
Last edited:

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
343
Reaction score
531
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
Sorry, I don't see the link you provided.
Did you jump to page 5 and find post #74? It’s linked in that post and says “Window Sticker etc.” and it is underlined
 

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
343
Reaction score
531
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
1641658400500.png

My scheduled build day is today, 1/8/22. My sequence numbers are 116/567.

1641658509014.png




Ford's tracking page shows that I am "In Production" but shows no date.

Is anyone else in the same or similar position? If so, have you received any kind of notifications about your build?


(How about you, @Deep ... any word on yours?)

My tracker has shown in production with no date stamped for about 16 days now. No other notifications received about my build.

But since you’re scheduled for today, that may answer our question earlier about how many days a week they crank out vehicles. Gotta be at least 6 days, right? Lol
 

Maverick Matt

2.0L EcoBoost
Well-known member
First Name
Matt
Joined
Oct 13, 2021
Threads
2
Messages
46
Reaction score
77
Location
Ontario Canada
Vehicle(s)
Maverick
Engine
2.0L EcoBoost
Did you jump to page 5 and find post #74? It’s linked in that post and says “Window Sticker etc.” and it is underlined
Oh man, glazed right over that. I have looked over that before, but my window stick just seems to be missing the blend date.
 

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
343
Reaction score
531
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
Oh man, glazed right over that. I have looked over that before, but my window stick just seems to be missing the blend date.
Yea lots of ppl have stated the Maverick stickers don’t list the blend dates like previous Ford vehicles, for whatever reason — apparently to frustrate their customers
 

Sponsored

h0llow88

New member
First Name
Augustin
Joined
Jan 8, 2022
Threads
0
Messages
1
Reaction score
1
Location
Florida
Vehicle(s)
2010 Nissan Sentra | 1979 C3 Corvette
1641658400500.webp

My scheduled build day is today, 1/8/22. My sequence numbers are 116/567.

1641658509014.webp




Ford's tracking page shows that I am "In Production" but shows no date.

Is anyone else in the same or similar position? If so, have you received any kind of notifications about your build?


(How about you, @Deep ... any word on yours?)
I ordered 6/28
Email scheduled for production week of December 20th, 2021

Today it is the same deal as yours In Production with the same exact dot, no date. My window sticker shows 1049/1535
A51 Hybrid XLT Lux package co-pilot360 w/all weather and carpet mats.

Logging into the "as-built shows no modules populated at all.
 
  • Like
Reactions: Cad

Stock411

2.5L Hybrid
Well-known member
Joined
Aug 7, 2021
Threads
16
Messages
229
Reaction score
301
Location
HI
Vehicle(s)
2022 Ford Maverick XLT Hybrid
Engine
2.5L Hybrid
1641658400500.webp

My scheduled build day is today, 1/8/22. My sequence numbers are 116/567.

1641658509014.webp




Ford's tracking page shows that I am "In Production" but shows no date.

Is anyone else in the same or similar position? If so, have you received any kind of notifications about your build?


(How about you, @Deep ... any word on yours?)
Mine originally was like that, eventually a date was stamped next to In Production and the modules later that day populated when that date appeared.
 

Deep

2.5L Hybrid
Member
First Name
Pierre
Joined
Dec 27, 2021
Threads
1
Messages
23
Reaction score
17
Location
quebec canada
Vehicle(s)
Maverick XLT
Engine
2.5L Hybrid
Hello Mr DryHeat it's Deep. My Mav is still in prod mode, not built yet. Mayby it will show up tomorrow.
Regards
 

Younglefthander

2.5L Hybrid
Well-known member
First Name
Jack
Joined
Jun 23, 2021
Threads
9
Messages
185
Reaction score
306
Location
Orlando
Vehicle(s)
23 Maverick, 23 Bronco, 24 Ranger
Engine
2.5L Hybrid
Hey Guys, can I chime in. As I mentioned in a earlier post I was originally scheduled for 12/13 then my salesman told me it would be week of Jan 3rd. Bear in mind I've never received an email from Ford regarding my truck so I'm completely reliant on him to provide details which he's been pretty good plus I try not to bug him.
Then last week my salesman sent me a screen shot from the vehicle visibility site and it showed "schedule to day of 1/14 so I figured my week got pushed again. No biggie. I thought I would check the tracker yesterday just to see and I am showing in production and am able to see the window sticker. I do not see a blend date but

On the very top of the sticker it reads this
HRM-002594 FL
9-NORMAL,NB,002594,NA062 14295
R
RAMP
000000
315/606

In the "Special Order" it reads this
NA062 N RB 2X 225 002594 01 06 22

At the very bottom it is dated 1/07/2022

No clue what all this means and sorry but I struggle with copy/paste off of the window sticker.
Maybe someone can provide some insight.
Either way I'm happy that I seem to be closer to getting My Maverick
Thanks in advance,
 
Sponsored

DryHeat

2.5L Hybrid
Well-known member
First Name
DryHeat
Joined
Aug 18, 2021
Threads
8
Messages
1,578
Reaction score
3,439
Location
Arizona
Vehicle(s)
Jeep Patriot
Engine
2.5L Hybrid
Hello Mr DryHeat it's Deep. My Mav is still in prod mode, not built yet. Mayby it will show up tomorrow.
We're both in the "xxx/567" group and my "Scheduled to" day on my dealers computer is today, 1/8/22.

But I just saw that @Salty, who is in the "xxx/1535" group, got his tracker updated to production date 1/8/22.

That's kind of confusing. It makes me wonder if our "xxx/567" group has been moved to another date.
 

Salty

Well-known member
Joined
Jun 20, 2021
Threads
1
Messages
48
Reaction score
83
Location
LV
Vehicle(s)
Maverick
We're both in the "xxx/567" group and my "Scheduled to" day on my dealers computer is today, 1/8/22.

But I just saw that @Salty, who is in the "xxx/1535" group, got his tracker updated to production date 1/8/22.

That's kind of confusing. It makes me wonder if our "xxx/567" group has been moved to another date.
Tbh, nothing that has been done makes much sense. I’m just thankful the Mav rollout wasn’t as disastrous as the Bronco. I feel bad for anyone that has a Bronco order in. My Father-in-law placed a Bronco Sasquatch order on Aug 2020. Still no updates on that. He gave up and went with a Big Bend and is still waiting.
 

Deep

2.5L Hybrid
Member
First Name
Pierre
Joined
Dec 27, 2021
Threads
1
Messages
23
Reaction score
17
Location
quebec canada
Vehicle(s)
Maverick XLT
Engine
2.5L Hybrid
Hello Mr DryHeat it's Deep. My Mav is still in prod mode, not built yet. Mayby it will show up today. The XL NRA 29--- 335/1167 is already built 01-06, show up the january 7th. it is now showing shipped. So I think we will have good news very soon. Regards
Ford Maverick January 3rd build week? 1641724169337
 

casanewt

Well-known member
Joined
Jul 22, 2021
Threads
9
Messages
465
Reaction score
658
Location
Cincinnati
Vehicle(s)
2023 KIA Sportage X-Line Prestige PHEV
Engine
Undecided
Signs of life! Modules are active on 951/1535. No date by "In Production" yet or delivery estimate.

Ford Maverick January 3rd build week? 1641741070036
Sponsored

 
 







Top