Sponsored

Got The Email Today

gwalton1234

2.5L Hybrid
Well-known member
First Name
Geoff
Joined
Sep 13, 2021
Threads
3
Messages
98
Reaction score
95
Location
St. Louis
Vehicle(s)
2007 Saturn Aura
Engine
2.5L Hybrid
XLT Cactus Gray Luxury Package, co-pilot 360, bed extender ordered on 8/17/21. Got the email today with a build date of June 6. I guess this is really happening. I am kind of in shock. Extremely excited. Time to get my mods list ready!
Sponsored

 

Aza

2.5L Hybrid
Well-known member
Joined
Oct 15, 2021
Threads
3
Messages
812
Reaction score
1,062
Location
DFW
Vehicle(s)
2022 Maverick
Engine
2.5L Hybrid
Clubs
 
Yay!!! Congratulations!!
 

PaPaG

2.5L Hybrid
Well-known member
First Name
Ken
Joined
Apr 25, 2022
Threads
7
Messages
112
Reaction score
134
Location
St. Louis, MO
Vehicle(s)
2023 Maverick Alto
Engine
2.5L Hybrid
XLT Cactus Gray Luxury Package, co-pilot 360, bed extender ordered on 8/17/21. Got the email today with a build date of June 6. I guess this is really happening. I am kind of in shock. Extremely excited. Time to get my mods list ready!
Me too! 6-6....I am hoping it is not at 6 am or pm!
 
OP
OP
gwalton1234

gwalton1234

2.5L Hybrid
Well-known member
First Name
Geoff
Joined
Sep 13, 2021
Threads
3
Messages
98
Reaction score
95
Location
St. Louis
Vehicle(s)
2007 Saturn Aura
Engine
2.5L Hybrid
Just got an email from Ford that production has been moved to week of 7-4. The original build date was 6-6. Why did it take 17 days for them to tell me the start date has been moved. They need to work on their communication skills.
 

BrandonB81

2.5L Hybrid
Well-known member
First Name
Brandon
Joined
May 1, 2022
Threads
2
Messages
75
Reaction score
125
Location
Salem, VA
Vehicle(s)
22 Ford Maverick
Engine
2.5L Hybrid
My original build date was 6/6 then bumped to 6/13, then 6/27. Contacted Ford yesterday to see if they were still going to build it next week. It's been pushed to 7/25, no email this time. :mad:
 

Sponsored

aitch-2-oh

2.5L Hybrid
Well-known member
First Name
J
Joined
Nov 15, 2021
Threads
18
Messages
375
Reaction score
726
Location
Chicagoland
Vehicle(s)
Taurus X
Engine
2.5L Hybrid
Clubs
 
Identical dates, each segment. And thinking there’ll be at least 1 more change to extend the 7-25. Hope not!
 
OP
OP
gwalton1234

gwalton1234

2.5L Hybrid
Well-known member
First Name
Geoff
Joined
Sep 13, 2021
Threads
3
Messages
98
Reaction score
95
Location
St. Louis
Vehicle(s)
2007 Saturn Aura
Engine
2.5L Hybrid
Checked Ford’s Vehicle Order Checker and it went into production on 7-1-2022. It will be interesting to see how long it takes to change to built. From what I am seeing, I’m expecting 14 days’ish. We’ll see.
 

SiGmA_X

2.0L EcoBoost
Well-known member
Joined
Nov 20, 2021
Threads
1
Messages
239
Reaction score
133
Location
PNW
Vehicle(s)
2022 Maverick
Engine
2.0L EcoBoost
Checked Ford’s Vehicle Order Checker and it went into production on 7-1-2022. It will be interesting to see how long it takes to change to built. From what I am seeing, I’m expecting 14 days’ish. We’ll see.
For me, it was about a week total. But the timeline showed a header of "In production" for that time (6/18-23, scheduled build week of 6/20), and then it showed a date under "in production" on 6/23, and a date under Built on 6/24.
Sponsored

 
 







Top