Sponsored

built date to sticker

earlman123

2.5L Hybrid
Active member
First Name
david
Joined
Sep 4, 2022
Threads
15
Messages
30
Reaction score
24
Location
bakersfield, ca
Vehicle(s)
maverick
Engine
2.5L Hybrid
how soon does the sticker become available before its scheduled for production does anyone know?
Sponsored

 

Johnkn

2.5L Hybrid
Well-known member
Joined
Jan 19, 2022
Threads
56
Messages
1,886
Reaction score
2,596
Location
MD
Vehicle(s)
22 TRX, Viper, 66 Shelby, 68.5 CJ Mustang, Pantera
Engine
2.5L Hybrid
2 days ago my window sticker became available the same day the truck moved to ‘in production”. It was not available when only scheduled.

.
 

Hrenklin

2.5L Hybrid
Well-known member
First Name
WIll
Joined
Jun 5, 2022
Threads
3
Messages
75
Reaction score
54
Location
Toronto
Vehicle(s)
Jeep Wrangler
Engine
2.5L Hybrid
how soon does the sticker become available before its scheduled for production does anyone know?
itll liely be available 1 week before your production date. if youre given a specific date for production thats the date itll go to the final stages on the assebly line. so 1 week before then. example, tomorrow (wqednesday) im scheduled for the final stages, my window sticker became available last week thursday
 

Johnkn

2.5L Hybrid
Well-known member
Joined
Jan 19, 2022
Threads
56
Messages
1,886
Reaction score
2,596
Location
MD
Vehicle(s)
22 TRX, Viper, 66 Shelby, 68.5 CJ Mustang, Pantera
Engine
2.5L Hybrid
My ‘23 moved to “in production” on 11-June. I checked for the window sticker the 5 preceding days, and the WS was not available until the 11-June update to “in production”

.
 

The Flush

2.5L Hybrid
Well-known member
First Name
Jim
Joined
Apr 7, 2022
Threads
4
Messages
95
Reaction score
143
Location
Southern Ohio
Vehicle(s)
'23 Maverick Hybrid Lariat Area 51
Engine
2.5L Hybrid
Clubs
 
My Maverick moved from scheduled to production somewhere between 5/23/23 and 6/13/23. Today is the first time I could access the window sticker. When I would click on the link from the pizza tracker that says tryout the link to your window sticker, it said it was not available. But it worked when I manually added my VIN to the end of this link https://www.windowsticker.forddirect.com/windowsticker.pdf?vin=

My pizza tracker says scheduled for week of 6/20/23, but says it is in production. Is 6/13/23 considered part of the week of 6/20/23? I would have thought that it mean next week instead of this week.
Ford Maverick built date to sticker InkedMy Lariat Hybrid Pizza Tracker 2023-06-14
 
Last edited:

Old Man

2.0L EcoBoost
Banned
Banned
First Name
Mike
Joined
Jan 6, 2023
Threads
6
Messages
1,332
Reaction score
1,700
Location
Nebraska
Vehicle(s)
2023 Lariat
Engine
2.0L EcoBoost
Reading the threads describing production, tracking, delivery in this section may be helpful in answering the rest of your questions.
Sponsored

 
 




Top