Sponsored

Build date

FlyingScot

2.0L EcoBoost
Well-known member
First Name
Michael
Joined
Dec 7, 2021
Threads
12
Messages
179
Reaction score
337
Location
South Florida
Vehicle(s)
XLT Eco Lux FX4 4K CP360 HPR
Engine
2.0L EcoBoost
XLT AWD LUX Eco 4K FX4 Moonroof. Was 2/21 received the same email moving build to 2/28. Even odds or better it moves again - hope not.
 

Sasz

2.0L EcoBoost
New member
First Name
Sheryl
Joined
Sep 3, 2021
Threads
0
Messages
3
Reaction score
15
Location
Florida
Vehicle(s)
Ford Maverick
Engine
2.0L EcoBoost
Original build date was 2/28 then moved to 2/21 then back to 2/28 NOW it is March 28th!
 

Bossman4

2.0L EcoBoost
Member
First Name
Terry
Joined
Jul 25, 2021
Threads
1
Messages
24
Reaction score
37
Location
49117
Vehicle(s)
Maverick Lariet
Engine
2.0L EcoBoost
Original build date was 2/28 then moved to 2/21 then back to 2/28 NOW it is March 28th!
Basically, the same date changes for me. Lariat luxury with 4K Ecoboost
 

Sponsored

stoptothink

2.5L Hybrid
Well-known member
Joined
Jul 30, 2021
Threads
1
Messages
845
Reaction score
1,371
Location
Utah
Vehicle(s)
'17 VW jetta
Engine
2.5L Hybrid
In the last 3 weeks we've been scheduled for build (March 7th), then had it changed to March 28th, and just received an email this morning that it is now March 21st. XLT hybrid, ordered on June 24th. I suspect it will probably be changed multiple times more before we actually take delivery.
 

ReadyMav

2.0L EcoBoost
Well-known member
First Name
Matt
Joined
Sep 2, 2021
Threads
5
Messages
54
Reaction score
60
Location
Peoria, IL
Vehicle(s)
Honda Accord
Engine
2.0L EcoBoost
I got an email today that moved my build date back to the 28th. I was wondering if you did as well?
Man good for you. I got the email last night that mine is now scheduled for March 21…pushed out a month.
 

2022mavxlt

Well-known member
First Name
Paul
Joined
Oct 12, 2021
Threads
20
Messages
118
Reaction score
60
Location
east coast
Vehicle(s)
ford
XLT AWD LUX Eco 4K FX4 Moonroof. Was 2/21 received the same email moving build to 2/28. Even odds or better it moves again - hope not.
Yea man i have a bad feeling were going to get pushed back again when the 28th gets close. We have pretty close builds hopefully they dont take forever. Keep me updated and ill do the same
 

TooManyVehicles

2.5L Hybrid
Well-known member
First Name
John
Joined
Jun 5, 2021
Threads
2
Messages
439
Reaction score
689
Location
Upstate NY
Vehicle(s)
15 F150 XLT, 21 BS Badlands, 22 Mav Hybrid
Engine
2.5L Hybrid
Watching Ford build dates is like watching a Pachinko Machine.

 

Deeunicorn

Well-known member
First Name
Denise
Joined
Oct 18, 2021
Threads
4
Messages
59
Reaction score
46
Location
Midland, Michigan
Vehicle(s)
2002 Mustang
I was march 28th then to march 7, yesterday I got an e-mail for March 21st
Sponsored

 
 




Top