Sponsored

Anyone with a Septempber Hybrid build date been rescheduled?

STARCOMMTREY1

2.5L Hybrid
Well-known member
First Name
Trey
Joined
Aug 6, 2021
Threads
81
Messages
2,499
Reaction score
6,675
Location
Boligee, AL
Vehicle(s)
F350, Ultra Classic, Versa Note and soon to be Mav
Engine
2.5L Hybrid
Has anyone with a Sept hybrid build date been rescheduled? Or have you received an in production email? Or are you like me and left in the dark?
Sponsored

 

Big_T

2.5L Hybrid
Well-known member
First Name
T
Joined
Jun 10, 2021
Threads
51
Messages
1,745
Reaction score
3,489
Location
North Carolina
Vehicle(s)
2022 Maverick XL Hybrid
Engine
2.5L Hybrid
I'm not September, but surprised my October 4 Hybrid XL schedule is still holding with this latest round of pushbacks and double pushbacks.
I think if you've got a Hybrid scheduled for September you're golden.
 

petercox27

Well-known member
First Name
Peter
Joined
Jul 12, 2021
Threads
8
Messages
90
Reaction score
96
Location
Hinesville, GA
Vehicle(s)
Mazda CX-3
I’ve never received any emails but my shop.Ford still says “in production” will update if it changes to built
 

Lappo424

Well-known member
First Name
Chris
Joined
Jun 13, 2021
Threads
33
Messages
549
Reaction score
748
Location
NJ
Vehicle(s)
Accord - Looking to switch to Maverick XL
I'm not September, but surprised my October 4 Hybrid XL schedule is still holding with this latest round of pushbacks and double pushbacks.
I think if you've got a Hybrid scheduled for September you're golden.
I'm in the same boat with big t
 

brnpttmn

2.5L Hybrid
Well-known member
Joined
Aug 12, 2021
Threads
1
Messages
1,213
Reaction score
1,955
Location
MN
Vehicle(s)
Maverick Hybrid
Engine
2.5L Hybrid
I'm not September, but surprised my October 4 Hybrid XL schedule is still holding with this latest round of pushbacks and double pushbacks.
I think if you've got a Hybrid scheduled for September you're golden.
My 10/4 hybrid build is still holding, too. I think ford is probably aligning a bunch of the hybrid builds for their 10/11 and 10/25 clean-up scheduling that's happening today. .
 

Sponsored

mikejohn13

2.5L Hybrid
Well-known member
First Name
Michael
Joined
Jul 28, 2021
Threads
12
Messages
171
Reaction score
383
Location
San Diego California
Vehicle(s)
2005 Ranger
Engine
2.5L Hybrid
My XLT hybrid is supposed to be built next week.
I haven't gotten anything from FORD yet changing that but I do have my fingers crossed 🤞
nothing changes.
 

Ronaldo

Well-known member
First Name
Ron
Joined
Jun 19, 2021
Threads
4
Messages
210
Reaction score
260
Location
Los Angeles
Vehicle(s)
71 bronco, 67 conv Mustang, 93 RX7 R1
Has anyone with a Sept hybrid build date been rescheduled? Or have you received an in production email? Or are you like me and left in the dark?
My hybrid was Oct 11 It just moved to Oct 18th
 
OP
OP
STARCOMMTREY1

STARCOMMTREY1

2.5L Hybrid
Well-known member
First Name
Trey
Joined
Aug 6, 2021
Threads
81
Messages
2,499
Reaction score
6,675
Location
Boligee, AL
Vehicle(s)
F350, Ultra Classic, Versa Note and soon to be Mav
Engine
2.5L Hybrid
My 10/4 hybrid build is still holding, too. I think ford is probably aligning a bunch of the hybrid builds for their 10/11 and 10/25 clean-up scheduling that's happening today. .
My 10 4 order was moved to 10 25
 

Big_T

2.5L Hybrid
Well-known member
First Name
T
Joined
Jun 10, 2021
Threads
51
Messages
1,745
Reaction score
3,489
Location
North Carolina
Vehicle(s)
2022 Maverick XL Hybrid
Engine
2.5L Hybrid
OP
OP
STARCOMMTREY1

STARCOMMTREY1

2.5L Hybrid
Well-known member
First Name
Trey
Joined
Aug 6, 2021
Threads
81
Messages
2,499
Reaction score
6,675
Location
Boligee, AL
Vehicle(s)
F350, Ultra Classic, Versa Note and soon to be Mav
Engine
2.5L Hybrid
who knows, they might move you back up a week or 2 in the coming weeks.
Ehhh o got one scheduled for the 27th anghow6
Sponsored

 
 







Top