- First Name
- Tom
- Joined
- Sep 22, 2022
- Threads
- 14
- Messages
- 43
- Reaction score
- 32
- Location
- SE PA/Northern Delaware
- Website
- www.silsdetail.com
- Vehicle(s)
- 1990 Mustang GT convertible
- Engine
- 2.5L Hybrid
- Thread starter
- #1
I ordered my Maverick XLT hybrid with lux package on 9/18/22 and like many got an email in late June saying I will need to move the order to a MY 24 order which I did right on the date, 7/17/23. So my question is, and some may have asked this already, what are my chances of my 2024 Mav XLT order being bumped up since I my 23 may not be built? I think Ford said if my 23 is not scheduled to be built by 10/1/23, my 24 order will be bumped up. In case I would rather wait for the 24 at this point since I do have an 2018 F150 (which I will trade or sell).
Sponsored
Last edited: