When I ordered my Eco Boost Maverick on 9-15-22 the dealer told me it will take around 9 months to get. It's scheduled to be built 6/19.
He nailed the time frame
i
My order went in Sept.15 got an email 3 hours later from Ford confirming my order. I got two 45 day can't build emails. On April 13 got email saying it will be built the week of 6/19.
Alto Blue Eco-Boost, Lariet Lux ,4k tow, FX4 ,360 copilot full size spare tire.
)7:30am Email From Ford
📅 June 19th
🛻 Altio Blue Lariat Luz, ECO Boost, 360 Co Pilot, 4K Tow Package, FX 4 Off Road Package, Full size spare tire
📍 Northern California
🗓 Sept 15th, 2022
🕺 Dealer Town Ford
I had a Kia with same turbo 4cly engine and DCT transmission as the SC
The transmission overheats in traffic, it overheats going up hills or with 4 people in it. Go on U tube it overheated on a fire road during the off road test.
But if you get the non-turbo it should be ok, because it doesn't...
Go on U tube and watch the EB Maverick vs SC video
The turbo SC has a DCT transmission which are prone to overheating
But at the end of the day get what you want
I have 206,000 on my 2000 F250 with the 7.3 diesel. I'm going to sell it as soon as I get my Mavrick.
This truck has been great, only thing not factory are the batteries . But I now longer need this big beast
I 'm jealous of you guys paying under $4 a gallon for gas. I paid $6.19 for diesel and 6.50 a gallon for 91 octane this week and that's cheaper than it was a month ago.