Today I sat in a quite place with my Maverick build sheet that tells me it's being built on 6-21. We had a couple of Old Fashions together and talked about planning our first road trip
I have 2 Hyundai's love both of them one has 75,000 miles the other 98,000 both are trouble free. i'm glad you didn't get the turbo with DCT my sonhad that set up in his Kia. He sold the Kia and bought a Colorado. The kia transmission would over heat and it would go into limp mode.
Enjoy
I'm not saying they didn't deserve those. I think the reason they don't have any scheduled this go around is because they got 70 last time. I think they my be out of allocations.
But what do I know I just read this stuff and chime in every once in awhile
My dealer told me if you want a Maverick order the Eco Boost. It will take between 6 to 9 months to get. Ordered on Sept 15,2022. Truck is being built on 6-21 -23.
It's a loaded Lariat Lux with 4k and towing package and 360 co pilot it was a code 19
Since Ford didn't build enough Hybrids in 2022...
I'll most likely be out of town when mine comes in. I told the dealer that and he said no problem it's your truck we will just put it in the showroom till you pick it up.