- Joined
- Sep 20, 2022
- Threads
- 17
- Messages
- 239
- Reaction score
- 259
- Location
- Eugene, Or
- Vehicle(s)
- FJ Cruiser
- Engine
- 2.5L Hybrid
- Thread starter
- #1
I was checking the operating hours for Hermosillo Plant, and it operates 24/7. Anyone know if that is true??
Is that standard practice of the Auto Industry to operate plants around the clock??
24/7 is 168 hours, with 6000 Mavericks a month, that's about 8 Mavericks every hour...
Capacity of the plant was improved to 300,000 units per year. The plant was top rated in the category of "Compact Premium Conventional" for 2007 in terms of productivity, taking an average of 20.78 hours to assemble a vehicle, per Wiki......
So about 1/4 of Hermosillo is devoted to Mavericks...
Is that standard practice of the Auto Industry to operate plants around the clock??
24/7 is 168 hours, with 6000 Mavericks a month, that's about 8 Mavericks every hour...
Capacity of the plant was improved to 300,000 units per year. The plant was top rated in the category of "Compact Premium Conventional" for 2007 in terms of productivity, taking an average of 20.78 hours to assemble a vehicle, per Wiki......
So about 1/4 of Hermosillo is devoted to Mavericks...
Sponsored
Last edited: