Yes, I received an email from Ford on 3/17 that my hybrid XLT was built and the estimated delivery would be the week of April 4th. I ordered mine on 6/16/2021. It is a hybrid XLT Area 51 with the luxury package, co-pilot 360, and floor mats.My Maverick went into production on 3/14. My build details are in my signature. Was just wondering if anyone with the same date has heard anything yet. Thanks
Sponsored