- Thread starter
- #1
Notes:
• Production Weeks: 6/3 - 6/24.
• Retail Scheduling Only.
• XL availability is 21%.
Required Orders:
- XLT or Lariat Orders w/ 2.0L EcoBoost Gas Engine (999) and Tremor Off-Road Package (17V) without any of the exhausted series/equipment.
• Production Weeks: 6/3 - 6/24.
• Retail Scheduling Only.
• XL availability is 21%.
Required Orders:
- XLT or Lariat Orders w/ 2.0L EcoBoost Gas Engine (999) and Tremor Off-Road Package (17V) without any of the exhausted series/equipment.
Sponsored