Sponsored

Production moved to Sept 2nd from 8/21

GA Hot Pepper

2.5L Hybrid
Well-known member
First Name
Dick
Joined
Sep 20, 2022
Threads
19
Messages
142
Reaction score
277
Location
Georgia
Vehicle(s)
Mustang Mach E, F-150 Lariat, Toyota 4 Runner
Engine
2.5L Hybrid
Just checked on my 2023 XLT Hybrid. Tentative production date was Aug 21st, now showing Sept 2nd. No big deal, just 12 more days to wait.
Sponsored

 
OP
OP
GA Hot Pepper

GA Hot Pepper

2.5L Hybrid
Well-known member
First Name
Dick
Joined
Sep 20, 2022
Threads
19
Messages
142
Reaction score
277
Location
Georgia
Vehicle(s)
Mustang Mach E, F-150 Lariat, Toyota 4 Runner
Engine
2.5L Hybrid
Right! Maybe they could ship in 2 weeks. So I can get it exactly in one year to the day of order.
 
 







Top