Sponsored

order, production, built, shipped!

douhol1

Member
First Name
doug
Joined
Jan 19, 2022
Threads
3
Messages
8
Reaction score
7
Location
birmingham al
Vehicle(s)
2000 s10
Ordered maverick xl , no add on's, on 11/22/2021. In production 3/14/2022. Built 3/24/2022. Shipped on 3/29/2022 to Birmingham, Al. How long do you think it will take to get from Mexico to Alabama?
Sponsored

 

ShadowBlack XL440

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Jan 21, 2022
Threads
12
Messages
1,025
Reaction score
1,305
Location
Northern Ohio
Vehicle(s)
Non-Ford, not enought room to list..........
Engine
2.5L Hybrid
Ordered maverick xl , no add on's, on 11/22/2021. In production 3/14/2022. Built 3/24/2022. Shipped on 3/29/2022 to Birmingham, Al. How long do you think it will take to get from Mexico to Alabama?
Figure on 4 weeks minimum for shipping. It will move quickly at first but the closer it gets the longer the delays once they start splitting the load to various finial locations.
 

jcnnjc

2.0L EcoBoost
Well-known member
First Name
Jim
Joined
Oct 15, 2021
Threads
10
Messages
151
Reaction score
263
Location
Newnan Ga
Vehicle(s)
Fiesta ST , Alto Blue Maverick awd fx4
Engine
2.0L EcoBoost
My Fx4 Mav was produced on 3/7, only took a little over a week from the time it was in the U.S.
It went to Kansas City, then to Atlanta, I got it on the 25th of March.
It sat in Arizona for a week waiting for customs I guess
Sponsored

 
 







Top