Sponsored

Search results

  1. ⏱ No Maverick Scheduling Next Week (5/23)

    Was originally scheduled for 5/9, then 5/2, the back to 5/9, then to 5/16. then 5/23 the 5/30 and 6/6. This is worse than not be scheduled at all.
  2. Sour Apple Green Color Maverick Spotted

    Makes a perfect match for my lime green hovercraft.
  3. Got my first $90.00 worth of Maverick. Only need the other $27000

    I lucked out and found someone who decided not to take his Maverick and had bought some accessories and wanted to sell them cheap. He had floor liners, front and rear mud flaps, black letters and window vents, all from Ford. When I say cheap I mean cheap, got them all for $50.00 and a 260 mile...
  4. I think I'm done with my Maverick...

    I don't think anyone is going to be completely finished with their truck.
  5. CURT Bolt On Hitch for Maverick (rated to 4,000 lbs)

    Be very careful moving weight to rear. Move too much and trailer will throw truck around like a puppy with a stick. Must have more weight forward of the wheels to safely tow.
  6. ⏱ Maverick Scheduling Next Week (5/16) For Production Build Week 7/4

    Another week and another push back on my build. First scheduled for 5/9, moved to 5/2, then back to 5/9, then to 5/16, then 5/23 and now to 5/30. This is getting old fast. 7/12 order First Edition Rapid Red, Lariat lux and Copilot 360 packages with no other extras.
  7. Center console organizer

    Many public libraries have 3D printers available for use.
  8. 15K Miles Review and Stuff I Hate

    Most auto parts stores like Auto Zone and Advance Auto have a OBD tester you can check out and use. Check your codes and check them out online to see what the matter is (most times it's just a "burp" and the code will go away if you reset it. If it keeps coming back then take it to the dealer.
  9. Production week changed

    My Rapid Red FE was originally scheduled for 5/9, then moved to 5/2, then back to 5/9, then 5/16 and now 5/23
  10. Production week changed

    Originally was given build week of 5/9, then moved ahead to 5/2, then back to 5/9, again moved to 5/16 and now moved to 5/23. I think this is worse than not having a build week at all.
  11. ⏱ Maverick Scheduling Next Week (5/9) For Production Build Weeks 5/30 Through 6/27

    Received another email from Ford and again my build has been pushed another week to 5/23. First it was 5/9 then 5/2 and then back to 5/9 and last week moved to 5/16 and now to 5/23
  12. I told the sales manager I didn't need an extended warranty because my Maverick was built Ford Tough...

    My dealer includes a lifetime drivetrain warranty on all new vehicle sales. Warranty companies use any excuse Not to pay for a covered repair. A few drops of oil or transmission fluid on the underside will get any repair of engine or transmission refused with no arbitration allowed and will...
  13. HYBRID 2.5 MILEAGE......800 MILE TANK

    It's hard to get fuel mpg from just one tank. Need to have multiple fillups to get a good average. Fuel quality varies from brand to brand and location to location. Elevations (sea level to places like Denver) road bed conditions, weather, speed and drivers all contribute. Do manual...
  14. First Edition Maverick Production and Scheduling Update

    My Rapid Red FE with no other options was scheduled for 5/9 build, next week email with 5/2 date, next week email with 5/9 again and then this week another email with 5/16 date
  15. Lariat 1st edition build date is May 9th

    My FE was scheduled for 5/9, next week email said 5/2, next week another email with 5/9 again then this week another email with 5/16.
  16. ⏱ Maverick Scheduling Next Week (5/2) For Production Build Weeks 5/30 Through 6/27

    Had gotten Ford email with 5/9 build, next week email with 5/2, next week with 5/9 again and this week email with 5/16 date. Ordered Rapid Red FE with no other options on 7/12.
  17. When making your monthly payments through Ford Credit.

    Used autopay with them for 6 years with no problems. Just had to make the first payment manually.
  18. What option would you want that wasn’t offered

    AWD and 4k tow on the hybrid. Also drive mode to stay in last mode used when restarting.
  19. ⏱ Maverick Scheduling Next Week (4/25) For Production Build Weeks 5/30 – 6/20

    Just received email from Ford saying my production week has changed from May 2 to May 9 (where it was initially scheduled). So close yet so far. Rapid red FE with NO extras ordered 7/12
  20. If you had a chance to order again what would you change?

    Wish I could have ordered a second one but wanted it VB that was not available in FE




Top