Sponsored

What the hell does this mean?

Godzilla

2.0L EcoBoost
Well-known member
First Name
Michael
Joined
Oct 14, 2021
Threads
31
Messages
250
Reaction score
568
Location
Batavia Ohio
Vehicle(s)
Hyundai Tucson
Engine
2.0L EcoBoost
I was put in the dreaded Dec 19 build date. Meaning I was to have my order cancelled. Just checked with chat and I still have the old 22 VIN but now my schedule date is Jan 09. Are they going ahead and scheduling us poor bastards or what?
Sponsored

 
 







Top