Sponsored

First Reschedule Email + Here We Go

Redneck Garage

2.5L Hybrid
Well-known member
First Name
David
Joined
Aug 26, 2021
Threads
47
Messages
1,388
Reaction score
2,300
Location
Franklin TN
Website
www.theredneckgarage.com
Vehicle(s)
10 Wrangler 22 Lexus 22 Maverick 23 Maverick
Engine
2.5L Hybrid
Clubs
 
After 8 months I finally got a message from Ford that my truck will be built the week of May 9th. Now we're at May 16th. I wonder how many times this will happen.

Ford Maverick First Reschedule Email + Here We Go Screenshot_20220422-205812_Gmail
Sponsored

 

Mag Maverick

2.5L Hybrid
Well-known member
First Name
Philip
Joined
Aug 17, 2021
Threads
17
Messages
299
Reaction score
446
Location
Tennessee
Vehicle(s)
2019 Jeep Cherokee
Engine
2.5L Hybrid
Hey Dav, I got email from Ford to build my Maverick also that week XLT Hybrid, 360 , lux. Maybe it's Tn. Week.👍
 

LeersMav

2.5L Hybrid
Well-known member
First Name
Maximus GP
Joined
Jul 19, 2021
Threads
5
Messages
685
Reaction score
694
Location
Orange County, CA
Vehicle(s)
PriusV, Sonata PHEV, F-50 Mavrick Lariat Hybrid FE
Engine
2.5L Hybrid
I'd say you're fortunate to get the email update. Some members did not get anything, thanks to their dealers. It's just a waiting game. The life a retail order.

However, I know waiting 8 mos is a pain-in-the -butt. Keep the faith ..... YOUR Maverick will come, most likely in June with a May 16th Built Week. Or at least we hope.
 

Rob Cactus Gray

2.5L Hybrid
Well-known member
First Name
Robert
Joined
Sep 16, 2021
Threads
27
Messages
1,838
Reaction score
4,121
Location
Sierra Vista AZ
Vehicle(s)
11 Prius
Engine
2.5L Hybrid
normal to get 2-5 adjustments to the build date. I’m sure Ford says this is their standard operating procedure.
 
OP
OP
Redneck Garage

Redneck Garage

2.5L Hybrid
Well-known member
First Name
David
Joined
Aug 26, 2021
Threads
47
Messages
1,388
Reaction score
2,300
Location
Franklin TN
Website
www.theredneckgarage.com
Vehicle(s)
10 Wrangler 22 Lexus 22 Maverick 23 Maverick
Engine
2.5L Hybrid
Clubs
 
normal to get 2-5 adjustments to the build date. I’m sure Ford says this is their standard operating procedure.
I hear ya- I wanted it to be in the opposite direction - lol
 

Sponsored

OP
OP
Redneck Garage

Redneck Garage

2.5L Hybrid
Well-known member
First Name
David
Joined
Aug 26, 2021
Threads
47
Messages
1,388
Reaction score
2,300
Location
Franklin TN
Website
www.theredneckgarage.com
Vehicle(s)
10 Wrangler 22 Lexus 22 Maverick 23 Maverick
Engine
2.5L Hybrid
Clubs
 

dennish

2.5L Hybrid
Well-known member
Joined
Jul 15, 2021
Threads
9
Messages
167
Reaction score
319
Location
Goodyear, AZ
Vehicle(s)
Ford Maverick Hybrid Lariat :-)
Engine
2.5L Hybrid
After 8 months I finally got a message from Ford that my truck will be built the week of May 9th. Now we're at May 16th. I wonder how many times this will happen.

Screenshot_20220422-205812_Gmail.jpg
I waited 10 months - 5 rescheduled emails bouncing between 4/4,4/11 and 4/18. My truck was built this week, shipped 2 days later and scheduled for delivery in two weeks. You will get it :)
Sponsored

 
 







Top