Extended Delivery Date

HockeyDad

Member
Joined
Aug 16, 2021
Threads
1
Messages
6
Reaction score
2
Location
Florida
Vehicle(s)
Honda Ridgleline
My Lariat has been listed as In Production since 2/10/2022 with an Estimated Delivery date of 3/24/2022. I noticed this morning that delivery date on the order tracker has now been moved out to 6/22/2022. Any clue what's behind this?

Ford Maverick Extended Delivery Date MVRK_build.PNG
Sponsored

 

Brauntex

2.0L EcoBoost
Member
First Name
Buster
Joined
Jan 15, 2022
Threads
1
Messages
21
Reaction score
33
Location
Texas
Vehicle(s)
2022 Maverick XLT
Engine
2.0L EcoBoost
In many cases this means it has moved down the assembly line and is parked waiting on chip related modules or accessories or possibly a spray in bed liner if equipped.
 

A Dodge that drives Fords

2.0L EcoBoost
Well-known member
Joined
Jul 30, 2021
Threads
26
Messages
777
Reaction score
876
Location
Wisconsin
Vehicle(s)
Ford Taurus Ford Ranger
Engine
2.0L EcoBoost
Mine's kind of the same way I'm not as close to my delivery date as you were. Hopefully mine doesn't do the same thing when it gets closer. I'm at 3 weeks now for delivery it would have to be getting on a transport very soon to make the delivery date. Which mine still doesn't say built yet. Does yours say built?

Ford Maverick Extended Delivery Date Screenshot_20220222-091309~2


Ford Maverick Extended Delivery Date Screenshot_20220222-091234
 
OP
OP

HockeyDad

Member
Joined
Aug 16, 2021
Threads
1
Messages
6
Reaction score
2
Location
Florida
Vehicle(s)
Honda Ridgleline
No...mine never completed the "Built" stage.
 

Sponsored

OP
OP

HockeyDad

Member
Joined
Aug 16, 2021
Threads
1
Messages
6
Reaction score
2
Location
Florida
Vehicle(s)
Honda Ridgleline
I received additional information from my dealer today. The history report from Ford, only available to dealers, shows that the truck is assembled, short of parts. The vehicle disposition is "Micro Chip at Plant on Hold" with an ETA of 6/16-6/22. The Micro Chip in question is related to the CoPilot 360. So it appears the plant in Hermosillo won't be receiving the electronics until mid-June.
 

TooManyVehicles

2.5L Hybrid
Well-known member
First Name
John
Joined
Jun 5, 2021
Threads
3
Messages
483
Reaction score
743
Location
Upstate NY
Vehicle(s)
15 F150 XLT, 21 BS Badlands, 22 Mav Hybrid
Engine
2.5L Hybrid
Some are being built. I just got (about an hour ago) my ’built’ email. In production 2/10. Lariat + lux + cp360 + sunroof.

Next hurdle, getting the shipped notice. The built email gives me estimated delivery between 3/23 and 3/29.
 

Nightowl

2.5L Hybrid
Well-known member
Joined
Jul 25, 2021
Threads
15
Messages
231
Reaction score
603
Location
seattle wa
Vehicle(s)
2022 Maverick Lariat
Engine
2.5L Hybrid
Just when I think I've got it figured out:

--Dealer says chip shortage related to cp360

-- very next post reports a just built Mav with cp360

I'm going back to shaking my magic 8-ball.
 

jwiedle24

2.5L Hybrid
Well-known member
Joined
Jun 16, 2021
Threads
5
Messages
343
Reaction score
531
Location
Ohio
Vehicle(s)
Lariat w/Luxury Pkg
Engine
2.5L Hybrid
I received additional information from my dealer today. The history report from Ford, only available to dealers, shows that the truck is assembled, short of parts. The vehicle disposition is "Micro Chip at Plant on Hold" with an ETA of 6/16-6/22. The Micro Chip in question is related to the CoPilot 360. So it appears the plant in Hermosillo won't be receiving the electronics until mid-June.
Same thing had previously happened to me and a lot of other people from build week 1/3. I went In Production 1/11 and ETA at the time was 2/15. Then when February hit, ETA got pushed back to 5/19 because of a chip hold. Then all of a sudden it was built on 2/9 and my ETA moved back up to 3/13. It just shipped on 2/22.

So I’m GUESSING whenever there is a chip delay, they may do a 3 month pushback by default and then as chips become available they finish the trucks as built and the ETA could move back up.
 
OP
OP

HockeyDad

Member
Joined
Aug 16, 2021
Threads
1
Messages
6
Reaction score
2
Location
Florida
Vehicle(s)
Honda Ridgleline
Same thing had previously happened to me and a lot of other people from build week 1/3. I went In Production 1/11 and ETA at the time was 2/15. Then when February hit, ETA got pushed back to 5/19 because of a chip hold. Then all of a sudden it was built on 2/9 and my ETA moved back up to 3/13. It just shipped on 2/22.

So I’m GUESSING whenever there is a chip delay, they may do a 3 month pushback by default and then as chips become available they finish the trucks as built and the ETA could move back up.
Actually I have a friend that recently got a Bronco and had a similar experience. His delivery went from December, to March, and suddenly back to January. Perhaps as you said, a 3 month delay is automatically added by default for chip delays.