Aside from being scheduled for the entire month of June and then pushed to 7/25, I unexpectedly went into production around last Monday. I got my window sticker last Thursday 7/7. When can I expect to be built? and also when will I get an estimated delivery window? currently I do not have one
Sponsored

 

pxpaulx

2.0L EcoBoost
Well-known member
Joined
Jun 15, 2021
Threads
18
Messages
1,504
Reaction score
2,087
Location
Minnesota
Vehicle(s)
Ford Maverick
Engine
2.0L EcoBoost
I believe the sticker is generated about a week in advance of the actual production run. Production can be a day to a week depending on your build details (for add-ons that need to be done in other facilities, like spray in bed liner).

So you're probably in production today/this week. Ship sometime next week. I bought from Granger myself, it was about a month from built to delivery. So you're looking towards the end of August being the most realistic delivery time.
 

Aza

2.5L Hybrid
Well-known member
Joined
Oct 15, 2021
Threads
3
Messages
812
Reaction score
1,062
Location
DFW
Vehicle(s)
2022 Maverick
Engine
2.5L Hybrid
Clubs
 
It varies. I’ve seen some say it was built in a day and some take weeks before it says built. Once it is built, then you will get the delivery estimate.