- Thread starter
- Banned
- #1
Hooooray!
After being stuck "in production" for over 2 months the truck was marked built on the March 13th and now appears to be on it's way!
Dealer is now anticipating my truck should be in 3/23-3/29 (2022!) instead of 4/23-4-29
Very excited. Plan is to fly in to Las Vegas. Dealer will pick me up and shuttle me to AZ. Finish the deal and then I have a 850~ mile road trip back to the Northern CO foothills.
Not sure if I should take hwy 191 and go through MOAB or hit the 15 fwy until I hit I-70. Both are ridiculously scenic. It's only about a hours difference in drive time (so negligible). Planning on taking lots of pictures along the way.
After being stuck "in production" for over 2 months the truck was marked built on the March 13th and now appears to be on it's way!
Dealer is now anticipating my truck should be in 3/23-3/29 (2022!) instead of 4/23-4-29
Very excited. Plan is to fly in to Las Vegas. Dealer will pick me up and shuttle me to AZ. Finish the deal and then I have a 850~ mile road trip back to the Northern CO foothills.
Not sure if I should take hwy 191 and go through MOAB or hit the 15 fwy until I hit I-70. Both are ridiculously scenic. It's only about a hours difference in drive time (so negligible). Planning on taking lots of pictures along the way.
Sponsored