I have a 2023 Maverick XLT Hybrid. After less than a week of driving and with ~1900 miles I received a Service Engine Soon Warning.
This message was sent to my Ford Pass App:
Service Engine Soon Warning
What Is Happening?
The engine control system has detected an air leak into the engine that...
The way I figure it there are 5 build days (1 week) for each hour the orders were opened. This means if your Maverick was ordered at 2:00 on 9/18 then you will have to wait 8 1/2 months before your Maverick gets scheduled to build. :oops: