My truck went into production 8 days before it was shown built. I was scheduled for the week of 9/20, it went into production the 14th, window sticker showed up on the 16th. I got the email at 2am the 22nd it was built.
I called into the dealer this morning to get a better idea of my trucks shipping progress. It was shipped out on Saturday the 25th. So far it has went to AZ -> NM -> TX and back to NM with 2 to 3 different locations in each state. Now I get why it will take so long to get to NE. 🥴
Mine went into to production 8 days before the build day. I was scheduled for the week of 9/20. It changed to built on 9/22. So you might get built on the 5, 6 or etc.