7/27/2021 ordered XLT Hybrid, LUX, CO360, floor mats. Code 2 in December 2021. got VIN and build date on May 10th for 7/4 build week, then build dates have moved to 7/25, 8/1, 8/15, and this weeks CHAT declares 8/25 build week.
The games continue: Ordered 7/27/21 Scheduled to be built week7/4, 7/25, 8/1, and today CHAT says 8/15 build week. Have a VIN so therefore October build week is getting closer every day.
Chatted on Saturday with no change of status. Will check again later this week. What happened to scheduling for June builds? It disappeared from weekly plan.
I have been a code 2 since December for a hybrid, XLT, lux, co360 ordered in July and awaiting a build date. Keeping watch while I ask Wife if I can borrow her car again.
Dealer and from Ford @1-800-334-4375 when checking on order status since the 7/28 order date. Was told code 2 status early January call that I was code 2 since December.
When are they going to list the real constraint on the Maverick is the HYBRID DRIVE SYSTEM COMPONENTS dating back to order day one. They will make 2.0 ECO, lux, co360, in xlt or lariet since the first day of production and still do. Hybrid issues caused orders for them to stop in November...
The DEALER allocation system works as it is intended to achieve in the allocation of product between its wholesale point of sales based on Dealer previous volumes. That logic is for floor plan support not for a customer order process. The "coding" of orders between floor plan units and true...
Going from a 1993 S10 is a major shock to not have a bench seat, no cassette player, loud muffler, roll down windows, manual door locks, real 4wd, 15" tires prices, buying gas at 14 mpg rate, having two keys with no push button fob in pocket, the quiet of not hearing the alarms, bells, and dings...