- First Name
- Steve
- Joined
- Jul 21, 2021
- Threads
- 52
- Messages
- 2,570
- Reaction score
- 4,347
- Location
- coppell tx
- Vehicle(s)
- 2023 Ford Maverick Hybrid
- Engine
- 2.5L Hybrid
- Thread starter
- #1
Just got the latest update from my dealer on my order build schedule.
Scheduled to Day 11/17 on 10/22 then switching to Scheduled to Week 11/22 on 10/29 then again switching to Scheduled to Day 11/28 on 11/5. All changes Ford made were on Friday's 10/22, 10/29 and 11/5. I now dred Friday.
It is very confusing especially the switching from Build Day to Build Week then back to Build Day.
EDIT: The latest (11/13) screenshot from my dealer shows that I have a "production day of 11/29" which is a Monday.
Scheduled to Day 11/17 on 10/22 then switching to Scheduled to Week 11/22 on 10/29 then again switching to Scheduled to Day 11/28 on 11/5. All changes Ford made were on Friday's 10/22, 10/29 and 11/5. I now dred Friday.
It is very confusing especially the switching from Build Day to Build Week then back to Build Day.
EDIT: The latest (11/13) screenshot from my dealer shows that I have a "production day of 11/29" which is a Monday.
Sponsored
Last edited: