Sponsored

Ordering week for August 1st 2022 build week of 9/26.

cavemold

2.0L EcoBoost
Well-known member
First Name
JC
Joined
Mar 18, 2022
Threads
67
Messages
2,069
Reaction score
1,308
Location
Cailforina
Vehicle(s)
Ford Maverick 2022 Eco 2.0
Engine
2.0L EcoBoost
Sounds like the pushback means more orders will be built for 22.

Ford Maverick Ordering week for August 1st 2022 build week of 9/26. orer
Sponsored

 

MLowe05

2.5L Hybrid
Well-known member
Joined
Oct 1, 2021
Threads
7
Messages
2,469
Reaction score
4,279
Location
GA
Vehicle(s)
2020 Porsche Macan S/2023 Integra 6MT
Engine
2.5L Hybrid
They were always going to schedule builds through week of 10/17
 
 




Top