- Joined
- Jun 28, 2021
- Threads
- 11
- Messages
- 141
- Reaction score
- 323
- Location
- Massachusetts
- Vehicle(s)
- 2022 Ford Maverick Lariat, 1961 VW bug
- Engine
- 2.0L EcoBoost
No. The scheduling is for the build week of 11/22Am I reading this right, only 1 day of Maverick production?
If you get scheduled for that week, the exact day is kind of unknown until that week arrives.
Sponsored