- Joined
- Oct 15, 2022
- Threads
- 1
- Messages
- 251
- Reaction score
- 280
- Location
- "The Spirit of America"
- Vehicle(s)
- 2023 Maverick XLT ECO AWD; 2011 Ranger XLT RWD
- Engine
- 2.0L EcoBoost
I got my Scheduled for Production email on 1/12/23 for an original Build week date of 3/6/23. That changed to 3/13/23 to 3/20/23 to 3/27/23 to 4/1/23 to 3/29/23 to 3/30/23. I checked today to 3/31/23.
This was for 2023 Maverick XLT ECO AWD. Order date was 9/17/22.
This was for 2023 Maverick XLT ECO AWD. Order date was 9/17/22.
Sponsored