Long story short.....
Hybrid Lariat, loaded, Cactus Gray.
Ordered 7/4/21
Got my first build date of March 14 on Jan 6th. (Was about to throw in the towel)
New build date of March 28th a week later.
New build date of April 11
New build date of April 4th.
As of March 28, shows " In Production" (Which was early, as in before the most current to me Build date of week of April 4th! )
I have access to the window sticker etc etc.
So my Maverick has now been protection for 10 days....
So my question is....
How long was your Maverick "in production" before it showed Built?
Hybrid Lariat, loaded, Cactus Gray.
Ordered 7/4/21
Got my first build date of March 14 on Jan 6th. (Was about to throw in the towel)
New build date of March 28th a week later.
New build date of April 11
New build date of April 4th.
As of March 28, shows " In Production" (Which was early, as in before the most current to me Build date of week of April 4th! )
I have access to the window sticker etc etc.
So my Maverick has now been protection for 10 days....
So my question is....
How long was your Maverick "in production" before it showed Built?