- Thread starter
- #1
My truck's been showing "in production" for 10 days now, is this typical?
It's a 2025 Lariat hybrid
It's a 2025 Lariat hybrid
Sponsored
Oh that's great, thank you!Yes. Changes to “In production” 1-2 weeks before it is actually built. Just means it got sent to the plant. Then the plant arranges all the pieces needed. Takes 1-2 days to go down the assembly line. Then 1-2 days (some times more if there is a back log) for bed liner. Then it gets a final quality check, before it changes to ‘Built’.
I pf you want to know if it went down the line, go to this site and enter you VIN. If a ton of numbers show up, then it is alive.
https://www.motorcraftservice.com/AsBuilt
Oh yeah? Well mine was in production for 12 days, so it's gonna be WAY BETTER than yours!Mine was "in production" for 3 days.
![]()