- Thread starter
- #1
I’ve been pushed twice. Current build date February 21. Has anyone else with this date gotten pushed back again?
XLT hybrid no extras ordered June 16
XLT hybrid no extras ordered June 16
Sponsored
I've gone from February 21 to March 21 and then back to February 28th. So far that's the last date for my hybrid Lariat with 360 and the luxury packagesI’ve been pushed twice. Current build date February 21. Has anyone else with this date gotten pushed back again?
XLT hybrid no extras ordered June 16
I’m in same boat Feb 27 then mar 3 reset to mar 2 but just got window sticker ? Still no build and modules are not live yet so waiting but things are starting to happenGood luck the hybrid folks have been having a rough time. I’m Ecoboost on the 21st and from what I can tell still a crapshoot. Step 1 is getting a window sticker, step 2 is being in production, step 3 will be shipped. Who the heck can predict this - only the Shadow knows
Follow up. My dealer had it ready for me 2/22/23. Just in time for the big snow we’re having.Ordered January 18, 2022. Fully loaded Lariat 2.0 EB, headed for WA, eta 2/28-3/2.
I think the longest part of the wait is now because I‘m on the home stretch after more than a year. I got a chuckle out of the person that said it was a long wait, and he just ordered in September .