I ordered a HYBRID XL on July 23rd, Co-Pilot360, Trailer Hitch Receiver and Factory Spray in Bed liner.

December 9th got email saying scheduled for production week of 02/07.
January 29th got email saying production date change to week of 02/21.
February 26th, email saying vehicle was built and estimate for delivery to dealer is between March 20, 2022 and March 26, 2022.
February 28th, email saying "
Your new 2022 Maverick XL has shipped and is on its way!"

per "full history"

07/23/21 "in Order Processing" Unscheduled-Clean
12/09/21 "in Order Processing" Scheduled to Week (Week of Feb-14-2022)
01/28/22 "In Order Processing" Scheduled to Day (Feb-24-2022)
02/17/22 "in Production" Sent to Plant
02/23/22 "in production" at Body Shop
02/24/22 "in production" Trim Line
02/25/22 "in production" Produced
02/26/22 "in production" Released to Body Company (for spray in bed liner most likely)
02/26/22 "in production" Returned from Body Company
02/26/22 "Awaiting Shipment" Released
02/27/22 "Awaiting Shipment" Origin Received
02/27/22 "In Transit" Shipped Rail - Railcar #TTGX992338 12:08MT
02/27/22 "In Transit" Shipped Rail - Railcar #TTGX992338 13.08MT
03/02/22 "In Transit" Received at Junction Point (Union Pacific Railroad) Nogales, AZ 11:07MT (3 day train ride)

Per phone call today to UP trace, got message saying to be in Missouri 03/07/22 at 5:00PM
dealer told me should be going to terminal in Kansas City MO, downloaded then truck transport to Saint Louis area (who knows how long that will take)

Few things I found interesting:
Thought it quite interesting that on 01/28 that it was known to be scheduled for production on day 02/24 and that was when it was "in production" on Trim Line having started on the Body Shop on the 23rd

Build started on 02/23 (body), then 02/24 (trim line) and produced (built?) on 02/25
next day 02/26 to "body company" (for SIBL), same day back from "body company" (so no delay in SIBL) and Released awaiting shipment (all in same day!)
**my thought; so much for any delay for SIBL

Released for shipment on 02/26, on train and gone on 02/27 (that was fast!)

Across the border and in AZ on 03/02

Now the crazy part, think I'll sell it and order a Hybrid Escape, another long process I'm told.

Hope any of you find this interesting and helpful, good luck to all waiting for their Maverick.
Sponsored

 
  • Like
Reactions: BB0

Paulsr

2.5L Hybrid
Well-known member
First Name
Paul
Joined
Aug 16, 2021
Threads
5
Messages
302
Reaction score
186
Location
Lorain
Vehicle(s)
Ford mustang , escape, ford maverick
Engine
2.5L Hybrid
I ordered a HYBRID XL on July 23rd, Co-Pilot360, Trailer Hitch Receiver and Factory Spray in Bed liner.

December 9th got email saying scheduled for production week of 02/07.
January 29th got email saying production date change to week of 02/21.
February 26th, email saying vehicle was built and estimate for delivery to dealer is between March 20, 2022 and March 26, 2022.
February 28th, email saying "
Your new 2022 Maverick XL has shipped and is on its way!"

per "full history"

07/23/21 "in Order Processing" Unscheduled-Clean
12/09/21 "in Order Processing" Scheduled to Week (Week of Feb-14-2022)
01/28/22 "In Order Processing" Scheduled to Day (Feb-24-2022)
02/17/22 "in Production" Sent to Plant
02/23/22 "in production" at Body Shop
02/24/22 "in production" Trim Line
02/25/22 "in production" Produced
02/26/22 "in production" Released to Body Company (for spray in bed liner most likely)
02/26/22 "in production" Returned from Body Company
02/26/22 "Awaiting Shipment" Released
02/27/22 "Awaiting Shipment" Origin Received
02/27/22 "In Transit" Shipped Rail - Railcar #TTGX992338 12:08MT
02/27/22 "In Transit" Shipped Rail - Railcar #TTGX992338 13.08MT
03/02/22 "In Transit" Received at Junction Point (Union Pacific Railroad) Nogales, AZ 11:07MT (3 day train ride)

Per phone call today to UP trace, got message saying to be in Missouri 03/07/22 at 5:00PM
dealer told me should be going to terminal in Kansas City MO, downloaded then truck transport to Saint Louis area (who knows how long that will take)

Few things I found interesting:
Thought it quite interesting that on 01/28 that it was known to be scheduled for production on day 02/24 and that was when it was "in production" on Trim Line having started on the Body Shop on the 23rd

Build started on 02/23 (body), then 02/24 (trim line) and produced (built?) on 02/25
next day 02/26 to "body company" (for SIBL), same day back from "body company" (so no delay in SIBL) and Released awaiting shipment (all in same day!)
**my thought; so much for any delay for SIBL

Released for shipment on 02/26, on train and gone on 02/27 (that was fast!)

Across the border and in AZ on 03/02

Now the crazy part, think I'll sell it and order a Hybrid Escape, another long process I'm told.

Hope any of you find this interesting and helpful, good luck to all waiting for their Maverick.
Where did you get train information
 

maverick33

2.5L Hybrid
Well-known member
First Name
Ed
Joined
Oct 25, 2021
Threads
6
Messages
69
Reaction score
42
Location
Ga
Vehicle(s)
honda
Engine
2.5L Hybrid
Clubs
 
I ordered a HYBRID XL on July 23rd, Co-Pilot360, Trailer Hitch Receiver and Factory Spray in Bed liner.

December 9th got email saying scheduled for production week of 02/07.
January 29th got email saying production date change to week of 02/21.
February 26th, email saying vehicle was built and estimate for delivery to dealer is between March 20, 2022 and March 26, 2022.
February 28th, email saying "
Your new 2022 Maverick XL has shipped and is on its way!"

per "full history"

07/23/21 "in Order Processing" Unscheduled-Clean
12/09/21 "in Order Processing" Scheduled to Week (Week of Feb-14-2022)
01/28/22 "In Order Processing" Scheduled to Day (Feb-24-2022)
02/17/22 "in Production" Sent to Plant
02/23/22 "in production" at Body Shop
02/24/22 "in production" Trim Line
02/25/22 "in production" Produced
02/26/22 "in production" Released to Body Company (for spray in bed liner most likely)
02/26/22 "in production" Returned from Body Company
02/26/22 "Awaiting Shipment" Released
02/27/22 "Awaiting Shipment" Origin Received
02/27/22 "In Transit" Shipped Rail - Railcar #TTGX992338 12:08MT
02/27/22 "In Transit" Shipped Rail - Railcar #TTGX992338 13.08MT
03/02/22 "In Transit" Received at Junction Point (Union Pacific Railroad) Nogales, AZ 11:07MT (3 day train ride)

Per phone call today to UP trace, got message saying to be in Missouri 03/07/22 at 5:00PM
dealer told me should be going to terminal in Kansas City MO, downloaded then truck transport to Saint Louis area (who knows how long that will take)

Few things I found interesting:
Thought it quite interesting that on 01/28 that it was known to be scheduled for production on day 02/24 and that was when it was "in production" on Trim Line having started on the Body Shop on the 23rd

Build started on 02/23 (body), then 02/24 (trim line) and produced (built?) on 02/25
next day 02/26 to "body company" (for SIBL), same day back from "body company" (so no delay in SIBL) and Released awaiting shipment (all in same day!)
**my thought; so much for any delay for SIBL

Released for shipment on 02/26, on train and gone on 02/27 (that was fast!)

Across the border and in AZ on 03/02

Now the crazy part, think I'll sell it and order a Hybrid Escape, another long process I'm told.

Hope any of you find this interesting and helpful, good luck to all waiting for their Maverick.
If I read your post correctly, your build took about 5 months. So mind should come up for build sometime in March or April 2022 which will be my fifth/sixth month.
 
OP
OP
mcc63303

mcc63303

2.5L Hybrid
Well-known member
First Name
Bob
Joined
Dec 9, 2021
Threads
21
Messages
374
Reaction score
639
Location
St. Charles, MO.
Vehicle(s)
sold 22 Hybrid XL now 24 Hybrid XL, 57 Chevy 454ci
Engine
2.5L Hybrid
actually took 7 months... July 23, 2022 ordered, February 26, 2033 built. We'll see how long it takes to arrive at dealer.
 
OP
OP
mcc63303

mcc63303

2.5L Hybrid
Well-known member
First Name
Bob
Joined
Dec 9, 2021
Threads
21
Messages
374
Reaction score
639
Location
St. Charles, MO.
Vehicle(s)
sold 22 Hybrid XL now 24 Hybrid XL, 57 Chevy 454ci
Engine
2.5L Hybrid
Where did you get train information
Paulsr
What train info are you asking about? When taken from built to Railcar? What the railcar number is? When in U.S.? I guess the same answer for all.... from my salesman. He did a "full History" check/report. Any salesman should be able to get the info, you may be told it's "Ford Confidential" and not given to you. I have a long history with salesman and dealership. As far as the expected date to MO. I got that by calling the United Pacific Railroad trace number that's on other threads. Hope this helps. As to when you can expect yours.... ask your salesman if he'll check to see if there is an actual build day shown, my build DAY showed up about a month before, I was surprised to see that was available. Ford did give an accurate date of week of 02/21 by email a little over 3 weeks before. Oh, and mine is pretty basic, no special electronic stuff other than Co-Pilot360., however the number of module codes is huge, several pages of them. Good luck, be patient.
 

Sponsored

Paulsr

2.5L Hybrid
Well-known member
First Name
Paul
Joined
Aug 16, 2021
Threads
5
Messages
302
Reaction score
186
Location
Lorain
Vehicle(s)
Ford mustang , escape, ford maverick
Engine
2.5L Hybrid
Paulsr
What train info are you asking about? When taken from built to Railcar? What the railcar number is? When in U.S.? I guess the same answer for all.... from my salesman. He did a "full History" check/report. Any salesman should be able to get the info, you may be told it's "Ford Confidential" and not given to you. I have a long history with salesman and dealership. As far as the expected date to MO. I got that by calling the United Pacific Railroad trace number that's on other threads. Hope this helps. As to when you can expect yours.... ask your salesman if he'll check to see if there is an actual build day shown, my build DAY showed up about a month before, I was surprised to see that was available. Ford did give an accurate date of week of 02/21 by email a little over 3 weeks before. Oh, and mine is pretty basic, no special electronic stuff other than Co-Pilot360., however the number of module codes is huge, several pages of them. Good luck, be patient.
i have a expected delivery date just wondering how to get rail car number
Salesman said no way to track
 
OP
OP
mcc63303

mcc63303

2.5L Hybrid
Well-known member
First Name
Bob
Joined
Dec 9, 2021
Threads
21
Messages
374
Reaction score
639
Location
St. Charles, MO.
Vehicle(s)
sold 22 Hybrid XL now 24 Hybrid XL, 57 Chevy 454ci
Engine
2.5L Hybrid
i have a expected delivery date just wondering how to get rail car number
Salesman said no way to track
Paulsr, have you received notice your truck has been built? Salesman should be able to bring up the history as mine was but salesman may not be allowed to share with you. Salesman should be able to say it's built or not built. It could be built but parked waiting for something and have a delivery date but that may change. Truck has to be built and loaded on a rail car before a railcar number can be known. Again, salesman or a dealer principal should have access to a "full history" report. Not all dealerships give salesmen access to certain information but someone does. Sad to say even having the railcar number may not mean much because even after it gets to a terminal for down loading it still needs a truck to transport to the dealer and that can be a problem. It is nice to know it's at least out of Mexico and in the States.